Quality data, SPC and inspection records

Measurements, check sheets and nonconformances recorded against the same line, shift and machine data as production, so a quality question can be answered with the conditions that made the part.

For: Quality managers, quality engineers and production supervisors

A tiny inspector in a white coat measures a machined metal part with an oversized caliper on a dark granite surface plate, with identical parts lined up in a tray beside it.

Quality records in many plants live on clipboards and in spreadsheets. A torque reading written down at 10:15 is hard to line up with the changeover at 12:18, the temperature that drifted after lunch, or the reject count the machine kept on its own. When a customer asks what happened to a batch, someone spends a day rebuilding the story. Quality data puts those records in the same data model as production monitoring, so every measurement carries its line, shift, product and machine state.

What the software records

  • Measurements. From gauges with a data output, from the machine itself where the controller already measures the value (read through machine connectivity), or entered by the inspector on a tablet at the line.
  • Digital check sheets. Your paper forms, rebuilt with the same questions, required fields, the time of each entry and the person who made it.
  • First-article records. The first part after a setup or changeover: which characteristics were checked, the results and who signed off.
  • Nonconformance log. What was wrong, how many, the disposition (scrap, rework or hold), and the line, shift, product and machine state at the time.

Control charts and capability, by the published definitions

ASQ defines statistical process control as “the use of statistical techniques to control a process or production method.” Its main tool is the control chart, first developed by Walter Shewhart in the early 1920s. As ASQ describes it, a control chart “always has a central line for the average, an upper line for the upper control limit, and a lower line for the lower control limit,” and those lines “are determined from historical data.”

For process capability, ASQ describes Cp and Cpk as “process capability estimates” that “show how capable a process is of meeting its specification limits, used with continuous data.” Cp compares the specification width with the spread of the process. Cpk also accounts for how far the average sits from the nearer limit. Both are meaningful only for a stable process, so the capability report says when the control chart shows the process is not in control.

The formulas are short. The choices behind them are where plants differ, so we write them into your data dictionary before the first chart is drawn:

Decision The question to settle
Chart type Averages and ranges of subgroups, or individual readings with a moving range?
Subgroup How many parts per subgroup, and how often?
Control limits Calculated from which period, and when are they recalculated?
Standard deviation Within-subgroup for Cp and Cpk; overall for Pp and Ppk
Reaction plan What the operator does when a point falls outside the limits

In July 2026, AIAG and the German Association of the Automotive Industry (VDA) published the AIAG & VDA SPC Manual, a harmonized approach to statistical process control. If your customers refer to it, your quality team decides which methods apply, and we configure the charts to match and record the choices in the data dictionary.

The questions buyers ask

Can measurements come straight from gauges?

Often. Gauges with a data output, measuring machines that write report files, and values the machine controller already measures can all be read without retyping. We check each gauge during the equipment and data survey. Where a gauge has no output, the inspector enters the reading on a check sheet that knows the limits and flags a value outside them.

Will this satisfy our customer’s PPAP or audit?

We cannot promise that, because the decision belongs to your customer and your auditor. What the software does is keep records complete, timestamped, tied to a person and exportable, with the calculation methods written down. Your quality team decides what to submit and how.

Can we export records?

Yes. Measurements, check sheets, first-article records and nonconformances can be exported as CSV or Parquet files, a SQL dump or through a documented REST API, at every service level. The details are on our open data page.

Example (fictional). A fictional beverage bottler’s Line 2 reads capper torque from the filler’s controller every cycle, and the software forms subgroups of five readings. Before the 12:18 changeover to 1-liter bottles, torque averaged 16.5 in-lb with a within-subgroup standard deviation of 0.8 in-lb against specification limits of 12 to 20 in-lb, so Cp is 8 ÷ 4.8 = 1.67 and Cpk is 3.5 ÷ 2.4 = 1.46. After the changeover, two subgroups plot above the upper control limit. The reaction plan sends the operator to check the capper head setting, and the check is recorded on the shift’s check sheet. The nonconformance log lists the shift’s 632 rejects with their reasons, so the quality report agrees with the 98.5% quality rate on the production report. Enter the same limits, average and standard deviation in the process capability calculator to see the arithmetic.

What you provide and what you receive

You provide You receive
The characteristics to track and their specification limits Digital check sheets built from your forms
Your sampling plans Control charts for each characteristic
A list of gauges and how they output readings Capability reports with Cp and Cpk
Your existing paper forms Record export in open formats
A person who owns quality records on your side A data dictionary with every method and rule

Starting small

Most plants start with the few characteristics that cause the most trouble on one line, often the ones a customer already asks about. A pilot line connects them, runs the charts through real shifts, and ends with a review against measures agreed in the pilot plan. Read more about SPC and inspection records in The Plant Data Journal, or plan a pilot line.

Start with one line.