Production monitoring for lines and machines
Run, idle and down time for every machine on the line, the reasons behind each stop, and a shift report your supervisors can trust because every number traces back to a signal.
For: Plant managers, production supervisors and continuous improvement leads

Most plants already know roughly how a line did yesterday. The supervisor’s notes say it “ran most of the shift”, the ERP says how many cases were booked, and the maintenance log mentions a jam. What nobody can say with confidence is how many minutes were lost, to what, and whether that is getting better. Production monitoring closes that gap by reading the answer from the machines themselves.
OpenGXT builds this as hosted software on top of the signals your equipment already produces. A small gateway on your network reads each machine’s state, counts and fault codes (see machine connectivity), and the software turns them into a shift board at the line and a report after every shift.
What the software shows
Every machine in scope is always in one of a few states: running, idle (ready but starved or blocked), down (stopped by a fault or a changeover) or in a planned stop such as a break or sanitation. The software records each state change with a timestamp, so the shift becomes a timeline you can read minute by minute.
From that timeline and the counts, it calculates:
- Run, idle and down minutes per machine and per line, with each stop listed with its start time, length and reason.
- Downtime by reason, ranked, so the top two or three causes are visible at the end of every shift and every week.
- Cycle time and rate against the ideal rate you set for each product.
- Good and rejected counts, taken from the machine or from an inspection station.
- OEE and its three factors, availability, performance and quality, calculated exactly as written in your data dictionary.
How OEE is calculated
We use the definition published by the Lean Enterprise Institute: availability rate × performance rate × quality rate. Availability is run time divided by planned production time. Performance is the actual count compared with what the ideal rate would have produced in the run time. Quality is good units divided by total units. The formula is short; the definitions behind it are where plants disagree, so we write them down with you before the first report:
| Term | The question to settle | Typical decision |
|---|---|---|
| Planned production time | Do breaks, meetings and sanitation count? | Excluded as planned stops, listed by name |
| Ideal rate | Nameplate speed, best demonstrated rate or budget rate? | The fastest rate the line is designed or proven to sustain for that product |
| Downtime | When does a short stop become downtime? | A stop longer than a threshold you choose; shorter ones count as slow running |
| Good units | Is reworked product good? | First-pass good only; rework tracked separately |
Example (fictional). A fictional beverage bottler’s Line 2 filler runs a 480-minute shift with a 30-minute planned break. It stops for 75 minutes: an 11-minute bottle feed jam, 26 minutes waiting on caps from the warehouse and a 38-minute changeover to 1-liter bottles, 13 minutes over its 25-minute standard. At an ideal rate of 120 bottles a minute it fills 41,212 bottles, 40,580 of them good. Availability is 375 ÷ 450 = 83.3%, performance is 91.6%, quality is 98.5%, and OEE is 75.1%. The shift report leads with the changeover, because it is the largest single loss and the one with a standard to compare against. Try the same numbers in the OEE calculator.
Downtime reasons operators will actually pick
The machine knows that it stopped. It often does not know why. A fault code covers part of the story; waiting on material, a missing operator or a quality hold does not appear in any PLC. So the shift board asks the operator for a reason when a stop passes your threshold, from a short list written in the words your people use.
We build that list with your supervisors during the survey: usually 10 to 20 reasons in two levels (for example, “Material” then “Caps not delivered”). A long list produces “Other”. A short, familiar list produces data you can rank. The reason tree goes into the data dictionary, and changes to it are logged so this month’s Pareto chart can be compared with last month’s.
What you see, and where
- At the line: a shift board on a screen the operator can read from the work position, showing the current state, the count against target, and any stop waiting for a reason.
- For supervisors: the shift timeline, the stop list with reasons, and a way to correct a mislabeled stop, with the correction logged.
- After every shift: a one-page report sent to the people you name, with OEE and its three factors, the stop list, the top reasons, and counts against plan.
- For the plant manager: weekly trends by line and by reason, and an export of everything behind them.
Machines that follow the PackML state model (common on packaging equipment) already publish standard states, which shortens configuration. Machines that do not can usually be read from a run signal, a count and a fault word, which we identify during the equipment and data survey.
What you provide and what you receive
| You provide | You receive |
|---|---|
| The line to start with and its shift schedule | Configured shift board and shift report |
| Planned stops and ideal rates for each product | A data dictionary with every formula and definition |
| Your downtime reasons, in your words | A two-level reason tree and a weekly review template |
| Time with operators and supervisors on each shift | Onboarding at the line and written quick guides |
| A person who owns the report on your side | Hosting, maintenance and support after go-live |
How it fits with the rest of your systems
Production monitoring does not replace your ERP or MES. It reads production orders or product codes from them where that helps (so the ideal rate changes with the product) and can send shift totals back. The machine-level data stays available for quality records, maintenance triggers and energy per unit, because it is stored once in the same data model. Everything can be exported in open formats under our open data commitment.
Starting with one line
A pilot connects one line, runs the board and the report through real shifts, and ends with a review against measures agreed before it started: do the counts match the line counter, do the states match what operators saw, and does the report answer the question the plant manager asks every morning. If it does, the same model extends to the next line. See how a pilot line is set up, or put a price on your own stops with the downtime cost calculator.
Start with one line.
Tell us which line you want to understand and the question you ask after every shift. We reply with questions or a time to walk it with you.