How we work, from survey to support
Every engagement moves through the same six stages. Each one ends with a document your team keeps, so you can see what was done, check it and decide on the next step.
For: Plant managers, operations leads, controls engineers and IT/OT leads

Plant software projects tend to go wrong in familiar ways. The scope lives in an email thread, the tags are mapped by someone who later leaves, and at the end nobody can say whether the pilot worked because nobody wrote down what “working” meant. OpenGXT works in six stages to avoid that. Each stage splits the work clearly between us and your team, and each one ends with a written output that you keep whether or not you continue.
The aim is always the same: shift-level answers from your own equipment data, built on open standards, hosted for you, and maintained after go-live. Most plants start with one line or one area as a pilot line, and the same stages repeat as more lines are added.
The six stages at a glance
| Stage | OpenGXT does | Your team does | Written output |
|---|---|---|---|
| 1. Survey | Lists machines, controllers, meters and network paths; asks what the shift report must answer | Names the line, shares equipment lists and drawings, gives time with the people who know the line | Survey report and signal inventory |
| 2. Connect | Sets up the gateway, reads each signal and tests it against the machine’s own display | Provides power and a network drop under your rules; your controls engineer confirms what may be read | Connection plan and per-signal test record |
| 3. Configure | Builds the data model, state maps, stop reasons, boards and reports | Agrees definitions, ideal rates and the reason list; names who receives reports | Configured boards, shift report and data dictionary |
| 4. Pilot | Runs the line through real shifts, onboards operators, fixes what is wrong | Operators enter stop reasons; supervisors check the timeline; one person owns the report | Pilot review against the acceptance measures in the pilot plan |
| 5. Roll out | Repeats the work on more lines, areas or sites on the same data model | Sets the order of lines, schedules access, names an owner per area | Rollout plan |
| 6. Run and support | Hosts, backs up, monitors, patches, changes and adds machines | Reports problems and asks for changes through one channel | Support log and monthly health summary |
1. Survey
The equipment and data survey is where most of the risk comes out. We walk the line with the person who knows it and record every machine in scope: its controller, firmware, communication ports and what it can already report. We note the meters and sensors that exist, the ones that are missing, and the network path from the line to the internet. Then we sit with supervisors and ask the question that matters most: what do you need to know after every shift?
Each machine is checked on its own. Some can be read directly through OPC UA, Modbus TCP or MTConnect, some publish PackML states, and some older machines need an added sensor, current transformer or I/O module. Any wiring or panel work is done by your electricians or a licensed contractor.
- Your team: names the line, shares equipment lists, network drawings and current shift sheets, and makes a controls engineer and an IT/OT contact available.
- Written output: a survey report (what is there, what can be read, what is missing, the risks and a recommended pilot scope) and a signal inventory, the tag list with units, ranges and sample rates. You can start one yourself with the signal inventory worksheet and the machine connectivity checklist.
The written pilot plan described on the engagements page is built from the survey, and the quote is set at this point too.
2. Connect
A small industrial gateway goes on your network, in the place your IT/OT lead chooses. It makes outbound connections only, so no inbound ports are opened on the plant network. Access to controllers is read-only by default, and no PLC or CNC program is changed without your controls engineer. If a value is not exposed today, your controls engineer decides whether and how to expose it.
We schedule the first connection for a planned stop. Each signal is then tested: the value the gateway reads is compared with the machine’s display or the meter’s face, units and scaling are checked, and timestamps come from a synchronized clock. The gateway is set to store and forward, so it buffers data while the internet connection is down and sends it when the connection returns. Credentials go into a password vault, never into documents or email. The details are on our security page.
- Your team: provides power and a network drop, approves the firewall rule, and has the controls engineer confirm which tags can be read without a program change.
- Written output: a connection plan (gateway location, network diagram, firewall rule, each connection with its protocol, and a rollback step for every change) and a per-signal test record showing what was checked, against what, by whom, and the result.
3. Configure
We place each machine in a data model that follows the ISA-95 hierarchy (site, area, line, cell, asset), so the next line fits without rework. Machine states are mapped to running, idle, down and planned stop. Ideal rates are set per product, planned stops are named, and the stop reason list is written with your supervisors in the words your operators use. Then come the screens: the shift board at the line, the supervisor views and the report that goes out after each shift.
Every number gets a written definition. OEE, for example, follows the Lean Enterprise Institute definition (availability × performance × quality), and the data dictionary records what you decided counts as planned time, which rate is the ideal rate and when a short stop becomes downtime.
- Your team: settles the definitions, agrees the reason list and names who receives which report.
- Written output: the configured boards, the shift report and the data dictionary, plus an operator quick guide for each screen.
4. Pilot
The pilot runs the configured line through real shifts. We are with operators and supervisors when they first use the board, check counts against the machine’s own counter, compare the timeline with what people saw, and follow up on stops that have no reason. Every fix goes into the change log.
The pilot ends at the decision point written into the pilot plan. We review the results against the acceptance measures agreed before the pilot started, and you decide: extend to more lines, adjust and run again, or stop. If you stop, you keep the documents and an export of the data.
- Your team: operators enter stop reasons, supervisors check the timeline, and one named person owns the shift report and the decision.
- Written output: the pilot review against the acceptance measures in the pilot plan.
The example line follows a fictional pilot signal by signal, with the shift timeline and the report.
5. Roll out
A rollout extends the same data model to more lines, areas or sites. Each new line gets its own survey entries, connection tests and configuration, but definitions and reason lists are reused so the lines can be compared. We onboard each crew at its own line and update the documentation as we go.
- Your team: sets the order of lines, schedules access around production, and names an owner for each area.
- Written output: a rollout plan listing the lines in order, the signals per line, access windows, owners, onboarding sessions and the go-live criteria. The go-live readiness checklist covers the checks to make before each line goes live.
6. Run and support
After go-live, OpenGXT hosts the system it built and maintains it. We back up the data and test the backups, apply patches, monitor gateways and data flow, make changes and add machines. Requests come through one channel, support@opengxt.com, and each one goes into the support log. Each month you receive a health summary: data gaps and their causes, gateway status, changes made and open items. The written exit plan, delivered at go-live, says what you receive if you ever leave (see the open data commitment).
- Your team: reports problems and asks for changes through support, and keeps a named person who owns the reports.
- Written output: the support log and the monthly health summary. More on support and maintenance.
What stays the same at every stage
- Documents are delivered in editable formats and belong to you: the signal inventory, data dictionary, data-flow and network diagram, operator quick guides, administrator runbook and change log. See documentation and onboarding.
- Controllers stay under your controls engineer’s authority.
- Your data can be exported in open formats at any stage.
- Each stage starts only after the written output of the one before it has been reviewed with you.
Start with one line.
Tell us which line you want to understand and the question you ask after every shift. We reply with questions or a time to walk it with you.