OpenGXT homePlan a pilot line
Menu

Support and maintenance after go-live

After go-live, the team that built the system keeps it running. We watch the gateways and pipelines, apply updates and patches, make the changes you ask for, and report on the system's health every month.

For: Plant managers, IT/OT leads and the system's local owner

A plain white service van with no markings is parked at a plant side door with its rear doors open on tidy tool drawers and cable reels, as a tiny technician lifts out a toolbox.

Plant-floor systems seldom fail all at once. They decay. A network switch is replaced and one gateway quietly stops sending. A new product goes into production without an ideal rate, so performance reads over 100%. The downtime reason list grows from 15 entries to 60 and half the stops land in “Other”. Each problem is small, and together they are why so many shift boards end up ignored. Support and maintenance is the work of catching them early and keeping the system as trustworthy as it was on the day of the pilot review.

At OpenGXT, the people who maintain the system are the people who built it, working from the same documents: the signal inventory, the data dictionary, the network diagram and the runbook.

What is included

  • Monitoring. We watch each gateway’s connection, each signal’s arrival and each scheduled report. A signal that goes stale is flagged before a supervisor notices a flat line.
  • Updates and security patches. For the gateway’s operating system and software and for the hosted application, tested in a separate environment first and applied in windows agreed under your change approval process.
  • Change requests. A new downtime reason, an ideal rate for a new product, a changed alert recipient or a new column on the shift report.
  • Adding machines. The same method as the first line: a survey of the machine, new rows in the signal inventory, a test record for each signal.
  • Runbook and document updates. Every change is entered in the change log, and the runbook, guides and data dictionary are updated to match.
  • A monthly health summary. Data completeness for each gateway, incidents and their causes, changes made, patches applied and open items.

Support or change?

What counts as support and what counts as a change is written into each agreement. This is how we usually draw the line:

Request Usually treated as Why
A signal stopped arriving Support The system is not doing what its documents say
A figure on the report does not follow its formula Support The data dictionary is the reference
Add or rename a downtime reason Small change Configuration, logged in the change log
Add an ideal rate for a new product Small change Configuration, logged in the change log
Connect a new machine or line Change, with its own estimate Needs a survey, new signals and tests
A new report or a new KPI Change, with its own estimate Needs a new definition in the data dictionary

The questions buyers ask

Who do we call at 2 a.m.?

Support hours, channels and named contacts are set in each written agreement, and we do not advertise round-the-clock cover. Two design choices make a night-shift problem less urgent than it sounds. By default the system only reads from your controllers, so a fault in it affects the reports, not the machines. And the gateway buffers data while its connection is down, so the record usually fills in once the problem is fixed. Day to day, support requests go to support@opengxt.com.

How fast do you respond?

Response targets are set in each written agreement, not published here. If you are comparing availability promises from any supplier, the uptime calculator shows how many minutes a percentage really allows, and which questions to ask about how outages are measured.

What counts as a change versus support?

See the table above. The rule of thumb: if the system is not doing what its documents say, it is support; if you want it to do something new, it is a change.

Can we stop?

Notice terms are in your agreement. At go-live you receive a written exit plan listing what you take with you: a full data export, schemas, configurations and documentation. The retrieval window after termination is written into each agreement. See our open data commitments.

Example (fictional). The November health summary for a fictional beverage bottler’s Line 2 reports that the compressed-air flow signal went stale at 06:20 on one day after the plant’s IT team replaced a network switch. Monitoring flagged it, support worked with the plant’s IT contact to restore the gateway’s access to the meter by 09:30. The 3 hours and 10 minutes without readings are marked as a gap in the signal history, not filled with guesses. The change log records the new switch port, and the network diagram is updated. The summary also lists one small change, a new reason under “Changeover”, “Waiting for QC release”, requested by the first-shift supervisor, and the gateway security patches applied in the agreed maintenance window after testing on a test gateway.

What you provide and what you receive

You provide You receive
Named contacts on your side A support channel and a support log
Your change approval process A change log for every change
Remote access for support, under your rules A monthly health summary
Notice of planned network or equipment changes Updated runbook, guides and data dictionary

How this fits

Support and maintenance follow every pilot that goes ahead, and they cover the hosted system as well as the gateways on site. Our security page describes how remote access, patching and incident contacts are handled, informed by NIST SP 800-82 and the NIST Cybersecurity Framework 2.0. The engagement types explain how support and maintenance are set up alongside a hosted subscription. To talk it through, plan a pilot line.

Start with one line.

Tell us which line you want to understand and the question you ask after every shift. We reply with questions or a time to walk it with you.