Free calculators, worksheets and checklists for plants
Working tools for the numbers plant teams argue about every week, and for the documents a connection project needs. They run in your browser and send nothing anywhere.
For: Plant managers, CI, quality, maintenance and controls engineers

These are the tools we reach for when we talk with a plant about its data. The calculators answer questions supervisors, maintenance leads, quality engineers and energy managers ask every week: what was OEE on that shift, what does an hour of downtime cost, can the slowest station keep up with demand, is this dimension capable. The worksheets and checklists cover the documents a connection project needs before the first signal is read.
They run in your browser
Every tool works on its own page. Nothing you type is sent to OpenGXT or anyone else, and nothing is saved when you close or reload the page. Worksheets and checklists can be downloaded as a CSV file or printed.
Each calculator opens with a fictional example already filled in. The OEE calculator, for instance, uses a fictional beverage bottler’s Line 2 filler on one 480-minute shift, the example used across this site. Replace the values with your own and the results update as you type.
How each result is calculated
Each calculator page shows the arithmetic, walks through the example and names the definition it follows. Where a primary source exists we link it: the Lean Enterprise Institute for OEE and takt time, ASQ and the NIST/SEMATECH e-Handbook for Cp and Cpk, and the U.S. Department of Energy’s compressed air tip sheet for leak costs. Where a formula is a plain definition, such as mean time between failures or storage per day, the page says so and shows the steps.
How the tools relate to our work
Most calculators do once, by hand, what our hosted software does after every shift from the machines’ own signals. Each maps to a service:
- OEE, downtime cost and takt time belong to production monitoring.
- MTBF, MTTR and PM compliance belong to maintenance software.
- Cp and Cpk belong to quality data.
- Air leak cost and energy per unit belong to energy monitoring.
- Data volume and uptime targets belong to cloud hosting.
The worksheets and checklists follow the documents we work through with a plant, from the signal inventory written during the equipment and data survey to the checks made before go-live. If a number you calculate here matters enough to track on every shift, that is usually where a pilot line starts.
Calculators
- OEE calculator
OEE and its three factors from one shift's minutes and counts.
- Downtime cost calculator
Lost margin, idle labor and recovery overtime for a period's unplanned downtime.
- MTBF and MTTR calculator
Mean time between failures, mean time to repair and availability.
- Takt time calculator
Takt time from demand and available time, checked against the slowest station.
- Cp and Cpk calculator
Cp, Cpk and expected out-of-spec parts per million from limits, mean and spread.
- Compressed air leak calculator
Leak flow, power and yearly cost from a no-demand load and unload test.
- Energy per unit calculator
Electricity, gas, total kBtu and energy cost per good unit for a period.
- Data volume estimator
Values per day and storage per year and retention from tags and sample rates.
- Uptime and SLA calculator
Allowed downtime per day, week, period and year for an availability target.
- PM compliance calculator
PM compliance, late and missed work orders, and the preventive share of labor hours.
- Topic namespace builder
Turn ISA-95 style asset names into MQTT and Sparkplug B topic paths.
Worksheets and checklists
- Signal inventory worksheet
An editable tag list with address, protocol, type, unit, rate, owner and use.
- Machine connectivity checklist
Twenty checks on controllers, network, protocols and change control before connecting.
- OT security checklist
Eighteen OT security checks drawn from NIST SP 800-82 and CISA guidance.
- Software requirements checklist
Twenty items to settle before choosing or commissioning plant floor software.
- Go-live readiness checklist
Sixteen checks on data, people, operations and fallback before a line goes live.
Start with one line.
Tell us which line you want to understand and the question you ask after every shift. We reply with questions or a time to walk it with you.