Engagements: pilot line, rollout, hosting and support
Most plants start with a pilot line. What follows depends on what the pilot shows, and every step ends with documents and data that stay yours.
For: Plant managers, operations leaders and the people who approve purchases

Every OpenGXT engagement is one of four types. Most plants begin with a pilot line: one line or one area, connected and run through real shifts against measures agreed in writing beforehand. What comes next depends on what the pilot shows. The stages behind each type are described on how we work.
The four engagement types
| Engagement | What it covers | When it fits |
|---|---|---|
| Pilot line | The equipment and data survey, then one line or area connected, configured and run through real shifts, with a written pilot plan, acceptance measures and a decision point | The first engagement |
| Rollout | More lines, areas or sites on the same data model | After a pilot that met its acceptance measures |
| Hosted subscription | Hosting, backups, updates and data exports | From go-live, for as long as you use the software |
| Support and maintenance | Monitoring, patches, changes, adding machines and a monthly health summary | From go-live, alongside hosting |
Pilot line
A pilot line answers one question: does this work on our equipment, with our people, well enough to extend? It starts with the survey and ends with a review and a decision.
| You provide | You receive |
|---|---|
| The line or area to start with, and its shift schedule | A survey report and signal inventory |
| Equipment lists, drawings and access to the line | A written pilot plan with acceptance measures |
| A controls engineer and an IT/OT contact for the connection | A connected gateway, a connection plan and a per-signal test record |
| Planned stops, ideal rates and downtime reasons in your words | A configured shift board, shift report and data dictionary |
| Operator and supervisor time on each shift | Onboarding at the line and operator quick guides |
| One person who owns the report and the decision | A pilot review against the acceptance measures |
What a written pilot plan contains
The pilot plan is written from the survey and agreed before the gateway is connected. It is short and specific, and it is approved by the person who will make the decision at the end.
- The line. Which machines are in scope, where the line starts and ends, and what is left out.
- The signals. The rows of the signal inventory the pilot will use, with how each one is read.
- The shift questions. The questions the report must answer after every shift, in your words. For example: “How many minutes did we lose, and to what?”
- The acceptance measures. What “working” means, stated so it can be checked: counts agree with the machine’s own counter within a stated tolerance, states match what operators saw, every stop over the threshold has a reason, and the report reaches the named people after each shift.
- Client responsibilities. Power and a network drop, firewall approval, controls engineer time, operator and supervisor time, and a named owner for the report.
- The decision point. When the pilot ends, who decides, and the options: extend to a rollout, adjust and run again, or stop. If you stop, you keep the documents and an export of the data.
The plan also lists the dates agreed with the plant for the connection and the pilot shifts, so nobody arrives during a production run unannounced. The example line shows a fictional pilot plan’s acceptance measures and how the review checked them.
Rollout
A rollout repeats the work on more lines, areas or sites, reusing the definitions and reason lists from the pilot so results can be compared. See multi-site operations for comparing lines and plants on one model.
| You provide | You receive |
|---|---|
| The order of lines, areas or sites | A rollout plan with lines, signals, owners and go-live criteria |
| Access windows that fit production | Each line connected, tested and configured on the same data model |
| An owner for each area | Onboarding for each crew at its own line |
| Agreement on shared definitions | An updated data dictionary, diagrams and change log |
Hosted subscription
The hosted subscription keeps the software running after go-live. More detail is on cloud hosting.
| You provide | You receive |
|---|---|
| The list of users and report recipients | Hosted software, kept updated |
| Your retention requirements | Backups, tested by restoring them, and retention as agreed |
| An outbound network path for the gateway | Data export in CSV and Parquet files, a SQL dump and a documented REST API |
| A named administrator on your side | A written exit plan delivered at go-live |
Support and maintenance
Support and maintenance keeps the system current as your plant changes. More detail is on support and maintenance.
| You provide | You receive |
|---|---|
| Problem reports and change requests through one channel | Monitoring of gateways and data flow |
| Notice of changes on the line, such as new machines or products | Patches and updates, recorded in the change log |
| Time to review the monthly summary | Changes, new reports and added machines |
| A contact for incidents | A support log and a monthly health summary |
Support hours and response targets are written into the support agreement, not promised on a web page.
How pricing is set
OpenGXT does not publish prices. Each engagement is quoted after the equipment and data survey, in a written proposal, because the work depends on what the survey finds. The things that move a quote are concrete:
- how many machines and signals are in scope, and how each one is read (an existing protocol, or an added sensor or meter);
- the network work: where the gateway sits and who sets up the path;
- the number of boards, reports and users;
- data retention, and any integration with an existing CMMS or ERP;
- the scope of support after go-live.
The proposal states which work is one-time and which recurs, and how the gateway and any added meters or sensors are supplied. You can prepare for the first conversation with the software requirements checklist.
What you keep, whatever you decide
At every decision point, the documents produced so far are yours, in editable formats, and so is the data. That is part of our open data commitment, not a term negotiated at the end.
Start with one line.
Tell us which line you want to understand and the question you ask after every shift. We reply with questions or a time to walk it with you.