OpenGXT homePlan a pilot line
Menu

Comparing lines and plants on one data model

Compare plants on the same definitions, let each site keep its own screens and reason lists, and add sites one at a time on the model the first one proved.

For: Operations directors, CI and engineering leads, and IT/OT leads across sites

Three identical small factory buildings on three separate square baseboards set apart on a table, joined by one thin yellow thread from roof to roof, a tiny figure on the middle roof holding it.

A weekly operations review with two plants on the screen often ends in the same argument. One plant reports a higher OEE, and the other plant’s manager explains, correctly, that the two numbers were not calculated the same way. Changeovers are planned time in one place and downtime in the other. One plant’s ideal rate is the nameplate speed; the other’s is last year’s best week. Until the definitions match, the comparison measures the spreadsheets, not the plants.

OpenGXT builds hosted software that puts every site on one data model with one set of definitions, while each site keeps the screens and words its people use. We host it centrally and maintain it after go-live.

One hierarchy for every site

Every asset sits in the same hierarchy: enterprise, site, area, line, cell and asset. The structure follows ISA-95, also known as IEC 62264, an international set of standards for integrating logistics systems with manufacturing control systems; its Part 1, Models and Terminology, was revised as ANSI/ISA-95.00.01-2025. We use its hierarchy as a naming pattern, so a filler in one plant and a filler in another have the same kind of address and the same signals under it.

On the network side, the same structure becomes the topic namespace the gateways publish to over MQTT, with Sparkplug B where it fits. Sparkplug’s birth and death certificates, which its publishers describe as giving subscribers confidence in data validity, help the hosted software tell a gateway that has dropped off from a line that has simply gone quiet. The topic namespace builder shows how a path is formed from the hierarchy.

One dictionary, one owner

The data dictionary holds every KPI formula and every definition behind it: planned production time, ideal rate, what counts as downtime, what counts as good. OEE follows the Lean Enterprise Institute definition at every site: availability rate × performance rate × quality rate.

In a multi-site rollout the dictionary has one owner on your side, usually someone in central operations or continuous improvement, who approves changes. Where a site has a real reason to differ, the exception is written next to the definition and the comparison reports flag it. Every change is logged with a date, so a jump in a trend line can be traced to a change in a rule rather than a change on the floor.

Questions multi-site teams ask first

Can we compare plants fairly?

Yes, on the definitions you agree. Comparison reports use the shared dictionary, show each site’s exceptions and put lines of the same type side by side. Where lines differ, such as a newer filler or a different product mix, the report says so instead of hiding the difference in an average.

Can each site keep its own screens?

Yes. Each site keeps its own shift boards, shift times, time zone and reason lists. Reason lists use two levels: the first level is common to every site (for example “Material”, “Equipment” or “Changeover”), and the second is local, in the words each site’s operators use. Corporate reports roll up the first level; the site keeps the detail.

Who owns the definitions?

You do. OpenGXT writes the dictionary with you and keeps the change log, but the decisions belong to the owner you name.

Hosting, permissions and data

All sites run on one hosted environment, described in cloud hosting. Each site’s gateway connects outbound only and buffers data if that site’s internet connection drops, then sends it when the connection returns. Permissions are set per site: a site’s people see their own lines, and central roles see every site. Every site’s data can be exported in open formats under our open data commitment.

Example (fictional). A fictional company runs the same model of packaging line in two plants. For one week, Plant A reports OEE of 77.8% and Plant B 66.6%. The dictionary review finds that Plant A treats its changeovers as planned stops, while Plant B counts them as downtime. Plant A’s week has 2,400 scheduled minutes, 150 minutes of breaks, 210 minutes of changeovers and 240 minutes of other stops, so its run time is 1,800 minutes, with performance at 90% and quality at 98%. With changeovers as planned time, planned production time is 2,040 minutes and availability is 88.2%. Under the shared definition, which counts changeovers as downtime, planned production time is 2,250 minutes, availability is 1,800 ÷ 2,250 = 80.0% and OEE is 70.6%. The gap between the plants falls from 11.2 points to 4.0. For the first month after the change, the comparison report shows Plant A under both definitions, clearly labeled, so nobody reads the drop as a worse week.

What you provide and what you receive

You provide You receive
A list of sites, lines and the main equipment at each One hierarchy for all sites, from enterprise to asset, and a topic namespace
A central owner for KPI definitions A shared data dictionary with local exceptions written down, and a change log
Local contacts at each site: operations, maintenance and IT Site-level permissions and local shift boards in each site’s words
Each site’s shift calendar and time zone Site comparison reports on the shared definitions
The order in which you want sites connected A rollout plan for each site, built from the pilot site’s configuration

Rolling out one site at a time

A multi-site program starts with a pilot line at one site. The pilot proves the data model, the dictionary and the reports on real shifts, and ends with a review against acceptance measures agreed before it started. Each further site then gets its own rollout plan built from that configuration: the same six stages described in how we work, with the survey checking where the new site’s equipment differs from the first. See engagements for how a pilot and a rollout are set up, and production monitoring for the reports each site receives.

Start with one line.

Tell us which line you want to understand and the question you ask after every shift. We reply with questions or a time to walk it with you.