Giving vendors remote access to plant systems without opening the door

The reader questionHow should a small plant grant, log and revoke remote access for integrators and software vendors?

A tiny worker handing a key on a long yellow string through a small hatch to a visitor outside, the other end tied to a hook inside.

Give every vendor the same single way in, and keep it switched off until the plant opens it for an approved job. That way in is a brokered connection through a DMZ or a hardened jump host, used with a named account and multifactor authentication, limited to the assets in the job, recorded, and closed by someone at the plant. Keep a register of every remote path and every person who can use one, read the session logs on a schedule, and practice cutting one vendor off without stopping a line. The FBI and CISA asked for exactly this in their September 23, 2026 fact sheet on third-party ICS integrators: “Use on-demand remote access if possible, so operators have to proactively allow remote access.”

This article turns that guidance, the January 2026 NCSC connectivity principles and NIST’s September 2026 draft of SP 800-82 Rev. 4 into seven steps a small plant can run with the people it has. It covers people coming in. Data going out to a cloud application is a different path with different rules, covered in connecting plant equipment to the cloud with outbound-only links.

A disclosure first. OpenGXT builds, hosts and maintains cloud software for manufacturers and distribution centers, and maintaining it sometimes means remote work on things we support. The rules below apply to us as much as to any integrator, and the last chapters say how.

What controlled vendor access looks like in a small plant

Controlled vendor access has six properties: one path, opened on demand, used by named people, limited to the job, recorded, and revocable without side effects. A plant that can show all six for every vendor has done most of what the current guidance asks.

Property What it means at a small plant Where the expectation comes from
One path Every vendor enters through the same brokered entry point, not a VPN or tool per vendor NCSC Principle 3
On demand The path is off until the plant turns it on for an approved window FBI and CISA fact sheet; NCSC Principle 2
Named people One account per person, with multifactor authentication CISA Performance Goals 3.C and 3.F
Limited to the job Only the assets and functions the task needs FBI and CISA fact sheet; CISA Performance Goal 3.H
Recorded Sessions logged, ideally recorded, with logs the vendor cannot edit NIST SP 800-82 Rev. 4 draft; CISA remote access guide
Revocable One vendor can be cut off while the line and other vendors carry on NCSC Principle 8; NIST SP 800-82 Rev. 3

Many plants start somewhere else. Three patterns the guidance warns about are a remote desktop tool on an HMI PC with a shared password, a vendor VPN account left active between jobs, and a cellular router a machine builder put in a panel during commissioning. The NIST draft names the risk in the second case: “persistent VPN tunnels with poor authentication factors may be exploited by attackers to gain network access using trivial techniques” (section 4.2.1.8).

Flat networks make each of these worse. The NCSC gives the example directly: “in a flat OT network with VPN access for vendors, a contractor connecting their designated equipment could also gain access to all other devices on the network” (Principle 6). Network separation is covered in the outbound-links article and the OT security checklist. This article assumes you have, or are building, at least a firewall between the plant floor and everything else.

What the September 2026 FBI and CISA fact sheet asks of plant owners

The fact sheet asks owners to treat integrator access as a risk to assess in every contract, to apply least privilege, to make remote access on-demand and monitored, and to keep the ability to run without the integrator. It is short, public (marked TLP:CLEAR) and written for critical infrastructure operators, but its advice fits any plant that lets an outside firm connect.

It opens with a warning: owners “should maintain caution when granting third-party ICS integrators high levels of access or control over industrial processes.” It then defines the principle of least privilege for OT as “granting users, processes, and systems only the minimum access necessary to perform their assigned tasks, and no more.”

The reason is concrete. According to FBI technical analysis cited in the fact sheet, between March and April 2025 foreign actors got into the network of a U.S. industrial automation company that offered system integration, engineering consulting and SCADA programming to industrial customers, including power utilities and transportation entities. They searched for terms including “customers” and “SCADA,” and created nine .zip files of about 800 files for presumed exfiltration, including customer SCADA information, ICS device details and schematics. An integrator’s network holds a map of its customers’ plants.

The fact sheet asks owners to put four questions into their risk assessments:

  1. What organizational data does the integrator store or have access to?
  2. Where is the data stored?
  3. Does the integrator have remote access for operational support?
  4. Can the organization operate independently if the integrator is compromised?

On the third question it is blunt: if the integrator has remote access, “there is a potential risk that a malicious cyber actor could gain access to the integrator’s network and pivot into the utility’s network to gain control of their systems.” On the fourth it advises that operators “maintain secure, offline backups of all software required to operate equipment.”

The second question has a specific angle. The fact sheet notes that integrators that “operate and host data outside of the United States may pose additional risks,” because other countries’ data laws may apply, even to a U.S. subsidiary. For a small plant the practical step is simple: ask where your drawings, programs and backups are kept, and write the answer into the contract.

Fact sheet recommendation Where it lands in the procedure below
Include cybersecurity and supply chain cybersecurity in contracts and service agreements Step 7, contract terms
Evaluate devices with external internet exposure Step 1, the access register
Monitor and log remote access, using routes you can monitor and on-demand access Steps 2, 3 and 5
Request an inventory of supplied software and hardware and how it connects Steps 1 and 7
Practice manual operations, accounting for where third parties fit Step 6, the revocation drill

Five other documents support the same procedure. The NCSC’s secure connectivity principles were published on January 14, 2026 with partners including CISA and the FBI. NIST’s SP 800-82 Rev. 4 initial public draft appeared on September 21, 2026, with comments due November 30, 2026; until it is final, Rev. 3 from September 2023 remains NIST’s current guide. CISA’s Cybersecurity Performance Goals 2.0 (report revised December 11, 2025) added a goal on risks from managed service providers. CISA, the FBI, EPA and DOE issued Primary Mitigations to Reduce Cyber Threats to OT on May 6, 2025. CISA’s Guide to Securing Remote Access Software dates from June 6, 2023.

Step 1: Build an access register of every remote path

An access register lists every way someone outside the plant could reach a plant system, and every firm and person who can use each one. Build it before changing anything, because remote paths are easy to add and easy to forget.

Look in six places:

  • The firewall. VPN configurations, remote desktop rules and any port forwarding to the plant floor.
  • HMI PCs and engineering workstations. CISA’s guide recommends auditing remote access software and its configurations to identify which tools are in use and which are authorized.
  • Machine panels. The NIST draft warns that “cellular modems and vendor-managed connections can bypass enterprise and OT network security controls” (section 2.4.6). Walk the panels, because these devices rarely appear on drawings.
  • New equipment. Machines can arrive with a remote support box from the builder. Ask at acceptance, not after the first incident.
  • Gateways and cloud agents. Anything that dials out to a vendor relay can carry a session back in.
  • Hosted software. Vendor staff who administer an application holding your data are remote users too, even though they never touch the plant network.

Then check the plant from the outside. The May 2025 primary mitigations put it first on their list: “Remove OT connections to the public internet,” because exposed OT devices “are quickly found by searching for open ports on public IP ranges.” The same document asks owners to “identify their public-facing assets and remove unintentional exposure.” A scan of your own public addresses, done with your internet provider’s knowledge, shows whether any remote path answers when nobody has opened it.

For each path, record what the NIST draft asks a remote access process to document: “the business justification for the access,” “the expected security controls and the responsibilities of the external organization and device,” and the mechanisms to revoke access and audit it (section 4.2.1.8). Add the people, because the fact sheet asks contracts to list “authorized personnel with access to systems.”

PathWho uses itWhat it reachesNormal stateLogsDecision
R1. Plant VPN to a jump host in the DMZControls integrator, two named engineersEngineering workstation for Lines 1 to 3Off; IT/OT lead enables per requestVPN and jump hostKeep as the single path
R2. Remote desktop agent on the Line 3 HMI PCPalletizer builder, unknown staffHMI PC and the PLC it talks toAlways onNone foundRemove; move support to R1
R3. Cellular router in the palletizer panelPalletizer builderPalletizer PLCAlways onNone at the plantDisconnect; label the port
R4. Administrator access to the hosted monitoring applicationSoftware vendor support staff, namedThe hosted application, not the plant networkOn, loggedApplication access log, shared monthlyKeep; review the names quarterly
R5. Gateway management through its outbound sessionSoftware vendorGateway configuration onlyChanges on approvalChange log and gateway logKeep; no controller writes allowed
Fictional example: an access register for a small plant with three lines. Columns follow NIST SP 800-82 Rev. 4 initial public draft, section 4.2.1.8 (justification, responsibilities, revocation and audit) and the FBI and CISA fact sheet of September 23, 2026 (authorized personnel, monitorable routes). Checked November 2026.

Two habits make the register useful. First, label every remote connection device in the plant. Rev. 3 recommends “labeling remote connection devices so that operations may disconnect quickly in the case of unauthorized use” (section 6.2.10). Second, copy each path into the asset inventory, because a router in a panel is an asset with firmware, an owner and a criticality like any other.

Step 2: Give every vendor the same brokered way in

Pick one entry point the plant controls, place it in a DMZ, and make every vendor use it. A separate VPN, remote tool or router for each vendor is several doors with several locks, and the plant holds few of the keys.

The NCSC describes the pattern in Principle 2. Where outside parties need access “(for example remote vendor support), use brokered connections through a secure gateway located in a separate, security-controlled segment such as a demilitarised zone (DMZ).” The external party connects to the broker, which relays the connection to the OT asset, so the OT system “is never directly exposed to the internet or external networks.” Principle 3 adds the small-plant lesson: rather than deploying separate VPN endpoints inside the OT network for each third party, centralize remote access in the DMZ, for consistent access control, session monitoring and “reuse of a single hardened access path across multiple vendors.”

Plant boundary Vendor named account and MFA Plant enables for the window Access broker in the DMZ off by default Jump host session recorded Line 1 PLC Line 1 HMI Everything else: not reachable Logs from the broker, jump host and firewall go to a plant log store the vendor cannot edit
One brokered path for every vendor, off by default, with the session recorded and limited to the assets in the ticket. Sources: NCSC, Secure connectivity principles for OT, Principles 2 and 3 (January 14, 2026); NIST SP 800-82 Rev. 4 initial public draft, sections 4.2.1.7.1 and 4.2.1.8. Asset names are illustrative. Checked November 2026.

The NIST draft lists the parts such a path is usually built from: “TLS/SSL VPNs” terminating in an OT DMZ, “complemented with additional tools”; access management tools that “can enforce strong authentication (including MFA), enable least-privilege access, and improve auditing”; jump hosts to “broker user access to remote OT devices”; and authentication servers kept separate from IT’s (section 4.2.1.8). It adds that privileged access management tools “can provide audited session recording for remote vendor and maintenance access” (section 4.2.1.7.1).

Option Fits Watch for
VPN terminating in the DMZ, then a jump host Plants with a firewall that supports it and an IT generalist VPN accounts that stay enabled between sessions
Remote access platform that brokers and records sessions Plants with several vendors It becomes a critical boundary device that must be patched; the NCSC notes the broker “must be actively updated and use modern authentication methods”
Escorted screen share started from inside the plant Rare, short diagnostic tasks The plant engineer must stay at the screen for the whole session
A vendor’s own router or remote tool left in place Nothing, as a standing path It bypasses everything above

Rev. 3 lists screen sharing among the ways to give temporary access, and one of its conditions favors the escorted option: “Initiating the connection from the OT environment” (section 6.2.10). For obsolete machines that cannot be patched, the NCSC suggests “a hardened jump host to facilitate vendor support, ensuring access is controlled and monitored.”

CISA’s own baseline for remote access, in the May 2025 primary mitigations, is a private connection with “virtual private network (VPN) functionality with a strong password and phishing-resistant multifactor authentication (MFA) for user remote access.” Whatever you choose, it is the only path. Every other path in the register is removed or moved behind it.

When a machine builder insists on its own router

Some builders support their machines only through their own remote box, and a plant buying a new filler or palletizer may not win that argument. Three fallbacks keep the box from becoming a standing door. Put the requirement in the purchase order before the machine ships, so the builder’s support works through your brokered path where it can. If the box must stay, keep it unplugged and labeled, and connect it only for an approved session with a plant person present. Where the builder’s design allows, place it behind your firewall rather than giving it its own internet link.

The fact sheet points the same way: owners should “work with integrators to understand where devices are hosted and minimize exposure by disconnecting devices from the public-facing internet.” Whatever you agree, the box goes in the register with its owner, its state and the date it was last connected.

Step 3: Grant each session on request, for a stated job and a stated time

A session starts with a request that names the person, the asset, the task and the window, and it ends when the window closes, whether or not the vendor logged off. The plant decides; the vendor asks.

NIST has asked for this since Rev. 3: “A process should be developed and communicated to the organization for requesting and enabling remote access. Remote access should be provided only if justified and limited to what is required for the business need. Remote access should not circumvent or negate safety or security controls” (section 6.2.10). The NCSC’s version is shorter: “Where possible, use just-in-time access, enabling connectivity only when required and disabling it otherwise.”

The session procedure

  1. The vendor submits a request with the fields in the table below, ideally a day ahead for planned work.
  2. The asset owner approves. The controls engineer approves anything touching PLC or CNC logic; the IT/OT lead approves the path. One person may hold both roles in a small plant.
  3. Operations is told. Rev. 3 lists “ensuring that operations personnel are aware of planned remote activity” among its conditions. The shift supervisor knows the window and whether the line will run.
  4. The path opens for the window. The account is enabled, multifactor authentication is required, and the broker allows only the named assets.
  5. The session runs, recorded. For any write to a controller, someone from the plant watches.
  6. The window closes. Access turns off automatically. Rev. 3 suggests “automatic timers for removing access” or a change process that confirms removal manually.
  7. The record is completed. What changed goes into the change log, with controller program backups taken before and after any logic change.
Request field Example (fictional)
Person and firm A. Ortiz, controls integrator
Asset or assets Line 1 PLC and Line 1 HMI only
Task and justification Add a reject counter to a readable register, approved change request CR-118
Read or write Write: program download to Line 1 PLC
Window Saturday 07:00 to 09:00, line stopped for sanitation
Plant contact during the session Controls engineer, on site
Rollback Program backup taken at 06:45; restore steps in CR-118

Emergencies happen, and the procedure needs an answer for them that is not “skip the procedure.” The NCSC describes break-glass access as “intended solely for emergency situations” and says it “should not be used as a standard remote access method”; any use should trigger the highest alarm (Principle 7). In a small plant that can be as simple as a phone call to a named person who enables the path and writes the request afterward.

Step 4: Use named accounts, multifactor authentication and least privilege

One account per person, never one per company; multifactor authentication on every remote login; and permissions limited to the assets and functions in the job. These three rules make the session log mean something, because each entry points to one person who could only do what the job needed.

Named accounts. CISA’s Performance Goal 3.C asks for distinct credentials across IT and OT and unique passwords for administrators and service accounts. A shared “integrator” login turns every log entry into a guess. The NCSC adds that human-to-machine connectivity “should be user aware so actions produce an employee specific audit trail” (Principle 5).

Multifactor authentication. Goal 3.F is specific for OT: “MFA is enabled on all accounts and systems that can be accessed remotely, including vendors/maintenance accounts, remotely accessible user and engineering workstations, and remotely accessible HMIs when available. If MFA is not available, remove remote access, introduce additional segmentation steps, and prioritize credential management.” It ranks methods from phishing-resistant (FIDO or PKI-based) down to app-based tokens, with SMS or voice “only used when no other options are possible.”

Least privilege. Goal 3.H asks that all accounts “operate with the minimum privileges necessary to perform their tasks” and recommends quarterly reviews of permissions. The May 2025 primary mitigations apply it to remote access: “Document and configure remote access solutions to apply principles of least privilege for the specific asset and user role or scope of work,” and “disable dormant accounts.”

Vendor role Typical reach Typical exclusions
Controls integrator Named PLCs and HMIs, program upload and download in an approved write session Other lines; network devices
Machine builder service technician Its own machine’s HMI and PLC, diagnostics first Every other machine
Plant software vendor Its gateway’s configuration; its hosted application Controllers; program changes
IT managed service provider Servers and network devices it manages PLCs, CNCs and HMIs

Device passwords need the same care as accounts. Many controllers and HMIs support only one shared login, and the vendors who service them may know it. The NIST draft notes that privileged access management tools can “rotate shared or embedded credentials, which are commonly found in OT” (section 4.2.1.7.1). Where no tool exists, keep those passwords in a vault, give the vendor a session rather than the password, and change the password when a vendor relationship ends.

Step 5: Log every session and read the logs

Log who connected, from where, to which asset, when, and what changed. Store the logs where the vendor cannot edit them, and have someone at the plant read them on a schedule.

The fact sheet’s instruction is short: “Ensure integrators access equipment using routes you are able to monitor.” CISA’s remote access guide adds two points that matter when the vendor also runs the tools. Contracts with managed service and software providers should require them to give customers visibility of logging, “including provider’s presence, activities, and connections to the customer networks.” And log servers, along with the ability to delete or alter logs, should stay out of reach of the remote management tools themselves.

CISA’s Performance Goal 3.Q asks that logs from firewalls, VPNs and similar devices be stored centrally, accessible only to authorized users, and that security staff be notified when a critical log function is disabled. Goal 3.E asks that unsuccessful logins be logged and that repeated failures raise an alert.

A weekly review in a small plant can take one person a short sitting if the register and request forms are kept:

  • Every session in the logs matches an approved request, by person, asset and window.
  • No session ran outside its window, and no account was used from an unexpected place.
  • Failed logins are explained.
  • No new remote path appeared: a new device on the network, a new tool on an HMI PC.
  • Write sessions have matching change log entries and program backups.

How long to keep logs is a judgment, not a fixed number. Goal 3.Q says logs are stored “for a duration informed by risk or pertinent regulatory guidelines.” A workable test for a small plant: keep session logs and recordings at least long enough to look back past the longest gap between a change and its discovery, which for a rarely run machine or a seasonal product can be many months. Check the storage this takes before you promise it.

Example (fictional). At a fictional three-line plant, the weekly review finds a Tuesday session on the Line 1 HMI that matches no request. The broker log shows the integrator’s named account, used from a different city than its engineer. A phone call settles it: a second engineer at the firm used his colleague’s login to check an alarm. Nothing was changed, but the account is disabled, the second engineer gets his own account and multifactor authentication, and the integrator is reminded of the contract clause on named users. The finding goes into the register’s notes for the next quarterly review.

Step 6: Revoke access, and rehearse doing it

Revocation has three cases: the end of each session, the end of a person’s or firm’s work, and an emergency. Write down how each one is done and who does it, then practice the emergency case before you need it.

End of each session. Handled by the timer or the manual confirmation in Step 3. If access is still on the next morning, the procedure failed.

End of a person’s or firm’s work. CISA’s Performance Goal 3.D asks for “a defined and enforced administrative process to off board staff (e.g., personnel, contractors, vendors),” including revocation of all access to systems and facilities, and suggests disabling accounts inactive for a set period, “e.g., 30 days.” The NCSC asks that human-to-machine permissions be part of joiners, movers and leavers processes. A vendor’s staff leave without telling you, so make the vendor tell you, in the contract.

Emergency. The NCSC’s Principle 8 describes the case directly: “if you become aware that a third party with remote access to your environment has been compromised, a well-architected ‘just in time’ access model allows you to temporarily revoke their access. You can maintain connectivity with other third parties while re-enabling the disabled connection once the risk has been mitigated.” It also asks that isolation plans cover contracts, for example “the ability to switch from remote support to having to physically attend the site.”

NIST’s control baseline in Rev. 3 adds the operational condition. For the control that requires a remote access disconnect, the OT discussion says “Implementation of the remote access disconnect should not impact OT operations. OT personnel should be trained on how to use the remote access disconnect.”

The revocation drill

  1. Announce a scenario. For example: “Our controls integrator reports its network was breached.”
  2. Disable the vendor’s access at the broker. Accounts off, any active session ended.
  3. Check the side doors. Confirm from the register that the vendor has no other path, and that any labeled device tied to it is disconnected.
  4. Confirm what kept working. Lines running, other vendors’ access unaffected, the monitoring data still flowing out.
  5. Rotate what the vendor knew. Shared device passwords and any credentials the vendor held.
  6. Switch to on-site support. Call the vendor’s contact and agree how urgent work will be done in person.
  7. Record and restore. Write down what happened, how long each step took, and what was missing; re-enable access only when the risk has been dealt with.

Example (fictional). A fictional plant runs its first drill on a quiet Friday afternoon. Disabling the integrator’s accounts at the broker takes a few minutes, and the lines never stop. The drill finds one gap: the integrator also knew the shared password on the Line 2 HMI, which nobody had rotated in two years. The password is changed, stored in the vault, and added to the register as a credential to rotate whenever a vendor relationship ends.

Step 7: Put the rules in the contract

The procedure only holds if the contract requires it. Name the access method, the people, the logs you can see, the incident notice, the inventory, and what happens at the end of the relationship.

The fact sheet lists what service agreements should cover:

  • “Data storage locations, information protection agreements, and protection of ICS data and design documentation”
  • “Remote access capabilities”
  • “Basics of the integrator’s cybersecurity program”
  • “Change management and patch management policies”
  • “Actions taken to secure deployed components (e.g., changing default passwords, disabling unused ports)”
  • “Listing authorized personnel with access to systems”
  • “Processes that enable local engineering support when necessary, limiting required integrator intervention”

It also asks owners to “request an inventory of all software and hardware supplied by the integrator, as well as documentation for how it connects to your infrastructure and how it will be updated.”

Clause What to write Source
Access method Vendor uses only the plant’s brokered path, on request, with named accounts and MFA; no vendor-installed remote tools or routers FBI and CISA fact sheet; CISA Performance Goal 3.F
Authorized people A named list, updated by the vendor when people join or leave FBI and CISA fact sheet; Performance Goal 3.D
Logs The plant keeps session logs; the vendor shares its own logs of access to plant systems on request CISA remote access guide
Incident notice How and when the vendor tells the plant about an incident affecting it CISA Performance Goal 1.E
Inventory and diagrams What the vendor installed, how it connects, how it is updated FBI and CISA fact sheet
Local support How urgent work is done on site if remote access is suspended NCSC Principle 8

CISA’s Performance Goal 1.E, new in version 2.0, covers service providers that remotely manage an organization’s IT or OT. It asks owners to understand the services and contracts, to “proactively address any security gaps that fall outside the scope of the contract,” and notes that “contracts should detail how and when MSPs notify the customer of an incident affecting the customer’s environment.”

Standards can help frame the conversation. ISA lists ANSI/ISA-62443-2-4, “Security program requirements for IACS service providers,” in the ISA/IEC 62443 series. You can ask a provider how its practices compare with that part. A provider that does not follow it, or holds no certification, can still meet every clause above. Data ownership, export and exit terms belong in the same contract, and they are the subject of data ownership and exit terms for plant software.

The same rules for the vendor that maintains your plant software

A vendor that hosts and maintains plant software is a remote party too, even when its gateway only connects outbound. Apply the same register, path, accounts, logs and revocation to it.

Three kinds of access are worth separating, because they carry different risks:

  1. Access to the hosted application. Vendor staff who administer the software that holds your production data. This access never touches the plant network, but it reaches your data. Put the named people in the register and ask for the application’s access log. The NIST draft says that when cloud-based or hosted services, including “vendor remote monitoring services,” are part of the OT architecture, their logs “should be included in the organization’s host-based logging inventory” (section 4.3.1.1.2).
  2. Access to the gateway on your network. Configuration changes and updates, either down the gateway’s own outbound session or through your brokered path. Either way, changes are approved and logged, and none of them writes to a controller.
  3. Access to plant devices. For a monitoring vendor this should be none. If a job ever needs it, it goes through your brokered path, on request, like any integrator.

How this applies to OpenGXT. Our gateways connect outbound only, access to controllers is read-only by default, and no PLC or CNC program is changed without the plant’s controls engineer. Credentials are kept in a password vault, never in documents or email. Access to the hosted software and the gateway is logged, and each engagement names the incident contacts on both sides. Where support needs remote access, it happens under the plant’s rules, as the support and maintenance page puts it. The details are on our security page, and the engagement types show where support sits in an agreement. Put us in your register like any other vendor, and ask us the questions in Step 7.

A first month for a small plant

A small plant can sequence the basics over its first month if one person owns the job. The order matters more than the speed: know your paths, close the extra ones, then make the remaining path accountable.

  • Week 1. Build the access register. Walk the panels, check every HMI PC and engineering workstation for remote tools, and read the firewall’s VPN and port rules.
  • Week 2. Choose the single path. Disconnect, uninstall or move behind it everything else that you can, and label the devices you cannot remove yet.
  • Week 3. Issue named accounts with multifactor authentication, write the request form, and agree the approval roles with the controls engineer and IT/OT lead.
  • Week 4. Run the first weekly log review and the first revocation drill. Send each vendor the new rules and the contract clauses you will ask for at renewal.

Then keep the register alive: review the names quarterly, re-run the drill after any network change, and add every new machine’s remote support device at acceptance. The access items sit alongside the network and recovery items in the OT security checklist, which is the place to start if your plant has not yet checked its basics.