OpenGXT homePlan a pilot line
Menu

OEE calculator: availability, performance and quality

Six numbers from one shift give you availability, performance, quality and OEE, plus the minutes lost to stops, slow running and rejects.

For: Production supervisors, CI leads and plant managers

A miniature conveyor carries small metal parts through three yellow gate frames, and after each gate a few parts sit in a gray bin, so fewer parts reach the end of the line.

Calculator

Fictional example values are filled in. Replace them with your own; results update as you type. Nothing you enter leaves your browser.

The fastest rate the line is designed or proven to sustain.

Results

Planned production time
450 min
Run time
375 min
Availability
83.3%
Performance
91.6%
Quality
98.5%
OEE
75.1%
Minutes lost to stops
75 min
Minutes lost to slow running
31.6 min
Minutes lost to rejects
5.3 min
Fully productive time
338.2 min

OEE = availability × performance × quality. The ideal rate is the fastest sustainable rate for this product, not the average or the budget rate.

Overall equipment effectiveness (OEE) compares what a line actually made with what it could have made in the time it was scheduled to run. The calculator above takes six numbers from one shift and returns the three factors, the OEE figure and, more usefully, the minutes behind each loss. It follows the definition published by the Lean Enterprise Institute: “Availability Rate x Performance Rate x Quality Rate = OEE”.

How the calculator works

The shift is cut down in three steps, one for each factor:

Factor Calculation What it measures
Availability Run time ÷ planned production time Time lost to unplanned stops
Performance Total count ÷ (ideal rate × run time) Time lost to running slower than the ideal rate
Quality Good count ÷ total count Output lost to rejects

Planned production time is the shift minus planned stops. Run time is planned production time minus unplanned stops. OEE is the three factors multiplied together.

The calculator then turns each loss back into minutes. Minutes lost to slow running are run time minus total count ÷ ideal rate. Minutes lost to rejects are rejected units ÷ ideal rate. Fully productive time is good count ÷ ideal rate. Stops, slow running, rejects and fully productive time add up to planned production time, so you can see where every minute went.

Example (fictional). A fictional beverage bottler’s Line 2 filler runs one first shift, 06:00 to 14:00: 480 minutes. The 30-minute break is a planned stop, so planned production time is 480 minus 30 = 450 min. The filler stops for 75 minutes (an 11-minute bottle feed jam, 26 minutes waiting on caps and a 38-minute changeover to 1-liter bottles), so run time is 450 minus 75 = 375 min.

  • Availability: 375 ÷ 450 = 83.3%
  • Performance: 41,212 bottles ÷ (120 per minute × 375 min = 45,000) = 91.6%
  • Quality: 40,580 good ÷ 41,212 total = 98.5%
  • OEE: 83.3% × 91.6% × 98.5% = 75.1%

In minutes: 75 min lost to stops, 31.6 min to slow running, 5.3 min to the 632 rejects, and 338.2 min of fully productive time. Fully productive time divided by planned production time (338.2 ÷ 450) gives the same 75.1%.

Collecting good inputs

  • Shift length and planned stops. Take them from the shift schedule. List each planned stop by name (break, meeting, sanitation) so the same items are excluded every day.
  • Unplanned stops. Include breakdowns, jams, waiting on material or people, and changeovers. The best source is the machine’s own state signal; a handwritten stop log usually misses short stops.
  • Ideal rate. Use the fastest rate the equipment is designed or proven to sustain for this product. Not the average rate, and not the budget rate.
  • Counts. Take total and good counts from the machine counter or the inspection station. Good means first-pass good: reworked units are not good units for OEE.

Reading the result

Start with the minutes, not the percentage. In the example, stops cost 75 minutes, more than twice the 31.6 minutes lost to slow running, and the changeover alone took 38 of those 75 minutes. Its standard is 25 minutes, so the first action is to find the 13 minutes over standard, not to chase a higher OEE in general.

If performance comes out above 100%, the calculator says so: the ideal rate is set lower than the line actually runs. Correct the rate before comparing shifts. If quality is the weak factor, the next question is which reject reason dominates, which needs reject counts by reason (see quality data).

To put a price on the minutes, carry the stop hours into the downtime cost calculator. To check whether the line can meet demand at this OEE, compare it with the station load from the takt time calculator.

Common mistakes

  • Averaging OEE percentages across shifts or lines. Add up the minutes and counts first, then calculate once. An average of percentages gives a short, slow shift the same weight as a full one.
  • Mixing products in one calculation. If the shift ran two products with different ideal rates, calculate each run separately, or convert each product’s count to minutes at its own ideal rate and add the minutes.
  • Moving a stop between planned and unplanned. Counting a changeover as planned raises availability on paper. Decide once, write it down, and keep it.
  • Comparing lines with different definitions. Two plants that define downtime or ideal rate differently cannot compare OEE. That is why we write every definition into a data dictionary before the first report.

From one shift to every shift

The calculator works for one shift you have already measured. Production monitoring does the same arithmetic after every shift from the filler’s machine state, good count and reject count, with each stop listed by reason. The fictional example project follows this Line 2 from the first signal to the first shift report. When you want these numbers without a clipboard, plan a pilot line.

Start with one line.

Tell us which line you want to understand and the question you ask after every shift. We reply with questions or a time to walk it with you.