Production performance

OEE, downtime, throughput and energy, measured so that a shift report leads to a decision instead of a debate about the spreadsheet.

For: Plant managers, production supervisors and continuous improvement leads

A tiny line supervisor holding a stopwatch at the end of a conveyor beside a growing stack of finished cartons, the conveyor stretching back out of focus.

Production performance: articles

A line’s numbers are only useful if the people who run it agree on what they mean. This section is for plant managers, production supervisors and continuous improvement leads who want shift reports that lead to a decision, not to an argument about how the spreadsheet was built.

The articles work from public definitions. OEE follows the Lean Enterprise Institute: availability rate × performance rate × quality rate, focused on the six major losses of failures, adjustments, minor stoppages, reduced operating speeds, scrap and rework. Machine states follow the PackML model where machines provide it. Compressed-air articles use the Department of Energy’s tip sheet on leaks, including its formula for what a leak costs. Worked examples, including the fictional Line 2 filler used across this site, are labeled as fictional and show their arithmetic.

Questions this section takes up

  • What belongs in planned production time, and which ideal rate should OEE use?
  • When does a short stop count as downtime, and when is it slow running?
  • How do you build a downtime reason list that operators will actually use?
  • How do you measure a changeover, and against what standard?
  • What does an hour of downtime cost once idle labor and recovery overtime are counted?
  • How do you put energy per unit next to output for the same line and shift?

The work behind these articles is described in production monitoring and energy monitoring, and the example project follows one fictional packaging line from its first signal to its first shift report. To run the numbers yourself, use the OEE calculator, the downtime cost calculator, the takt time calculator, the energy per unit calculator and the compressed air leak calculator.

Start with one line.

Tell us which line you want to understand and the question you ask after every shift. We reply with questions or a time to walk it with you.