Uptime and SLA calculator for availability targets

Enter an availability target and the downtime you measured. The calculator shows how many minutes the target allows and whether the period stayed inside it.

For: IT and OT leads, plant managers and anyone reviewing a hosting agreement

A miniature round wall clock with a blank face above a machine, a narrow yellow wedge painted at the edge of the dial, and a tiny figure on a ladder pointing at the wedge.

Calculator

Fictional example values are filled in. Replace them with your own; results update as you type. Nothing you enter leaves your browser.

Results

Allowed downtime in the period
43.2 min
Allowed downtime per week
10.1 min
Allowed downtime per day
1.4 min
Allowed downtime per year (365 days)
8.8 hours (526 min)
Availability achieved with the observed downtime
99.972%
Within the target?
Yes, 31.2 min to spare

Agree in writing whether planned maintenance windows count as downtime and how outages are measured (from where, at what interval) before you compare numbers.

An availability target written as a percentage sounds precise and says very little until it is turned into time. A target of 99.9% over a 30-day month allows 43.2 minutes of downtime. Over a year it allows almost nine hours. Whether that is strict or loose depends on when the minutes fall: ten minutes at 03:00 on a Sunday and ten minutes at the 06:00 shift start are the same number and very different events. This calculator does the conversion so the conversation can move on to the questions that matter.

How the calculation works

Allowed downtime is the length of the period multiplied by the share of time the target leaves over:

  • Allowed downtime = minutes in the period × (1 − target). A 30-day period has 43,200 minutes, a week 10,080, a day 1,440 and a 365-day year 525,600.
  • Availability achieved = 1 − (observed downtime ÷ minutes in the period).
  • Within the target compares the observed downtime with the allowance and shows the minutes to spare or the minutes over.

Results under two hours are shown in minutes (or seconds, under one minute). Longer results are shown in hours, with the minutes in parentheses.

Example (fictional). A fictional plant reviews one month of its hosted shift-report software against a 99.9% availability target. The month has 30 days, and monitoring recorded 12 minutes of downtime. The calculator returns:

Result Value
Allowed downtime in the period 43.2 min
Allowed downtime per week 10.1 min
Allowed downtime per day 1.4 min
Allowed downtime per year (365 days) 8.8 hours (526 min)
Availability achieved with the observed downtime 99.972%
Within the target? Yes, 31.2 min to spare

The month passed. The useful follow-up is how many outages made up the 12 minutes, when they happened, and whether any of them fell at a shift change, when supervisors are reading the shift report.

What common targets allow

Target Per day Per 30 days Per 365-day year
99% 14.4 min 7.2 hours (432 min) 87.6 hours (5,256 min)
99.5% 7.2 min 3.6 hours (216 min) 43.8 hours (2,628 min)
99.9% 1.4 min 43.2 min 8.8 hours (526 min)
99.95% 43.2 s 21.6 min 4.4 hours (263 min)
99.99% 8.6 s 4.3 min 52.6 min

Each added nine cuts the allowance by a factor of ten. It also changes what has to be measured: a target that allows seconds a day cannot be checked by a monitor that looks once every five minutes.

Settle the definitions before you compare numbers

The note under the results is the most important line in the tool. Two parties can measure the same month and get different answers unless these points are written down:

  • Planned maintenance windows. Do announced update windows count as downtime? If they are excluded, the agreement should say how much notice is given and how long a window may last.
  • Where it is measured from. A probe outside the plant, a browser at the plant and the gateway on the plant network each see different outages. If the plant’s internet link fails, the hosted software may be up while nobody at the plant can reach it.
  • The check interval. A check every minute cannot see a 20-second outage, and it rounds every outage it does see to whole minutes.
  • Partial outages. If the shift board loads but the shift report is not sent, is that downtime? Name the functions that count.
  • Late data versus lost data. When the plant’s connection drops, an OpenGXT gateway buffers readings and sends them when the connection returns. Screens show stale values for a while, but the history is complete. Decide whether that counts, and record it either way.

Do not mix this with machine availability

This calculator measures software or service availability over calendar time. It is not the availability factor in OEE, which is run time divided by planned production time (see the OEE calculator), and it is not inherent availability, MTBF ÷ (MTBF + MTTR) (see the MTBF and MTTR calculator). All three are called availability. Label each one in reports so nobody compares 83.3% line availability with 99.972% software availability.

How to use it in practice

Whoever owns the plant-floor systems, often the IT or OT lead, fills it in once a period from the monitoring record rather than from memory. Keep the period fixed, usually a calendar month, and keep the outage list next to the result: the number of outages and the longest one say more than the total. If a period goes over, ask what failed, whether the plant could keep working from the line’s own HMI and paper counts, and what changed to prevent a repeat. To put a price on minutes lost on the line itself, use the downtime cost calculator.

How this applies to OpenGXT’s hosted software

OpenGXT does not publish an uptime percentage on this site. How availability is measured and reported for hosted software is set in the written agreement, and support and maintenance covers monitoring of gateways and data pipelines and a monthly health summary. Bring this calculator, and your answers to the questions above, to that conversation. The security page describes backups and the named contact for incidents.

Start with one line.

Tell us which line you want to understand and the question you ask after every shift. We reply with questions or a time to walk it with you.