Requirements checklist for plant floor software
Write down what the software must answer, for whom, from which data and on what terms, before you talk to any supplier, including us.
For: Plant managers, operations and CI leads, and IT/OT leads preparing a request

Checklist
Requirements for plant floor software are usually written as feature lists: OEE, downtime, dashboards, alerts, mobile. Every supplier says yes to every line, and the plant learns what it actually needed during the project. This checklist starts somewhere else, with the questions people ask after every shift, and works outward to data, people, hosting and delivery. Fill it in before you talk to suppliers, OpenGXT included.
Why the groups come in this order
Each group depends on the one before it. The questions decide which data is needed. The data and the people decide the screens. The screens and the data decide hosting and retention. All of it decides what a pilot has to prove.
Questions the software must answer
Write down the three to five questions asked after every shift, who asks each one, and what they do with the answer. “How did Line 2 do?” is not a question software can answer. “How many minutes did Line 2 lose last shift, and to what?” is.
The item most often skipped is agreeing definitions in writing. OEE has a short public definition (availability × performance × quality, as published by the Lean Enterprise Institute), but planned time, the ideal rate, the threshold for a stop and what counts as a good unit are plant decisions. If two departments define them differently, the software gets blamed for the disagreement. Collect the reports people use today as well; they show which numbers already carry weight.
Equipment and data
List the lines and machines in scope and draft the signal list for the first line (the signal inventory worksheet has the columns). Stop and reject reasons belong here, in the words operators use. So does data from other systems: if the ideal rate changes with the product, the software needs the product code from the ERP or the production schedule.
People and screens
Operators, supervisors, maintenance and the plant manager each need different things. The line screen is the item most often underspecified: its size, mounting, reading distance and whether operators wear gloves decide whether it gets used. Decide early who may edit reasons, targets and shift calendars.
Hosting, security and data ownership
Settle where data is hosted, how long it is kept and how you get it out. Export formats and the exit procedure belong in the agreement at the start, not in a negotiation at the end. OpenGXT’s open data commitment puts this in writing: export in open formats (CSV and Parquet files, a SQL dump, a documented REST API) at every service level, and a written exit plan at go-live. Collect your IT and plant network security requirements here too. CISA’s Secure by Demand guidance for OT owners and operators (January 2025) is a useful source of questions for any supplier of OT products.
Delivery
Choose the pilot line and its success criteria before the pilot starts; criteria chosen afterward tend to describe whatever happened. List the documents and training you expect, write down support hours, channels and response expectations, and name the plant-side owner. Without that person, the project stalls the first time the supplier needs a decision.
Example (fictional). A fictional beverage bottler writes its first question as: “How many minutes did the Line 2 filler lose last shift, and to what?” The plant manager asks it at the end of first shift and uses the answer to choose which loss to work on next. The team agrees the definitions: the 30-minute break from 10:00 to 10:30 is planned time, the ideal rate is 120 bottles per minute, and only first-pass bottles count as good. On the example shift the answer is 75 minutes in three stops, led by a 38-minute changeover to 1-liter bottles that ran 13 minutes over its 25-minute standard. The data needed is the filler’s machine state, good count, reject count and active fault code, plus a stop reason from the operator.
Who fills it in
The plant manager or operations lead owns the checklist. The continuous improvement lead drafts the definitions, the controls engineer drafts the equipment and data group, and IT drafts the hosting and security group. Spend one session with supervisors from every shift on the questions and the reasons; the night shift may ask different questions from the day shift.
Common mistakes
- Starting from a supplier’s feature list instead of your own questions.
- Leaving the definitions to the supplier.
- Specifying line screens without standing at the line.
- Treating export and exit terms as a detail for later.
- Choosing pilot success criteria after the pilot.
What happens next
In an OpenGXT engagement, these answers feed the equipment and data survey and a written pilot plan for one line, with acceptance measures and a decision point at the end. See how we work for the six stages and engagement types for what a pilot line includes. When the pilot is ready to become the record, use the go-live readiness checklist.
Start with one line.
Tell us which line you want to understand and the question you ask after every shift. We reply with questions or a time to walk it with you.