Signal inventory worksheet for machines and meters

List every signal before anything is connected, with where it lives, how it is read, what unit it is in, who owns it and what it will be used for.

For: Controls engineers, maintenance and quality leads, and IT/OT leads

A tiny figure with a blank clipboard counts the ends of a thick cable bundle coming out of a miniature control cabinet, each cable end finished with a different colored ferrule and fanned out on the floor.

Worksheet

The rows are a fictional example. Edit any cell, add or remove rows, then download a CSV to share with your team. Nothing leaves your browser.

AssetSignalSource address or nodeProtocolData typeUnitSample or triggerOwnerUsed forRemove

Every connection project starts with a list of signals, whether anyone writes it down or not. When the list lives in one engineer’s head, nobody can later say which number on a dashboard came from which register, in what unit, or who to ask when it looks wrong. The signal inventory is that list, written down. In an OpenGXT project it is one of the first written outputs, delivered with the survey report before any machine is connected.

What each column is for

Column What to write Why it matters
Asset The name operators use for the machine or meter It becomes part of the topic or tag name
Signal A plain name for the value It is what reports and the data dictionary show
Source address or node OPC UA node ID, Modbus register, MQTT topic, or where a person enters it Anyone can find the value again
Protocol How the value is read It decides the connection method and security settings
Data type Boolean, integer, float, string or state code It raises scaling and code-table questions early
Unit The engineering unit after scaling Reports show psig, not raw register counts
Sample or trigger On change, every N seconds, or per event It drives data volume and what reports can see
Owner The person who can say whether the value is right Every question has someone to answer it
Used for The report, screen or decision that needs it If this is blank, ask why you are collecting it

Example (fictional). The six default rows describe Line 2 at a fictional beverage bottler. The filler’s machine state (OPC UA node ns=2;s=Filler.State, a state code read on change) feeds run, idle and down time. Its good count (ns=2;s=Filler.GoodCount, an integer in bottles, every 5 s) feeds output and performance, and its active fault code (ns=2;s=Filler.Fault, on change, owned by the maintenance lead) feeds stop reasons. The capper’s cap torque comes from Modbus TCP holding register 40112 as a float in N·m every 1 s, owned by the quality lead for torque trends and alarms. Compressor 1’s discharge pressure arrives over MQTT on plant/utilities/air/comp-1/pressure, in psig every 10 s, owned by facilities for leak and energy work. The last row is not a controller value at all: the stop reason is entered on the operator tablet for each stop, is owned by the shift supervisor and feeds the downtime Pareto.

Two things in the example are worth copying. State, fault and reason rows are event-driven (“On change”, “Per stop”), while counts and measurements are sampled at a fixed interval. And the owners differ by row: the controls engineer can tell you where the torque value lives, but only the quality lead can say whether it is acceptable.

How it relates to an OT asset inventory

CISA’s “Foundations for OT Cybersecurity: Asset Inventory Guidance for Owners and Operators” (August 13, 2025) defines an asset inventory as “an organized, regularly updated list of an organization’s systems, hardware, and software” and recommends an OT taxonomy that classifies assets “based on function and criticality”. A signal inventory is narrower: it lists data points, not devices. But building one forces the same walk through the plant, and every controller, meter and gateway you read appears in the Asset column with its address and protocol. Use the same asset names in both lists, keep criticality and firmware versions in the asset inventory, and use the OT security checklist for the rest.

Who fills it in, and when

The controls engineer fills in the source, protocol and data type. Maintenance, quality and production leads fill in the owner and the use. The IT or OT lead reviews the protocol column, because it decides what crosses the network. Start during the equipment and data survey, for the first line only, and keep the list current afterward: every machine added later adds rows, and every change goes in the change log.

How to act on it

Common mistakes

  • Exporting every tag in the PLC, often thousands, instead of the signals a report needs.
  • Leaving out units, or recording raw register values that still need scaling.
  • Counters that roll over at a fixed value, with no note on how to handle the rollover.
  • State and fault codes without the table that says what each code means. Put that table in the data dictionary.
  • Sampling everything every second because it is the default.

The signal inventory OpenGXT delivers also records the expected range of each value, so readings outside it can be flagged during testing. If you want the same check, add a range column to the CSV after you download it.

Start with one line.

Tell us which line you want to understand and the question you ask after every shift. We reply with questions or a time to walk it with you.