Documentation and onboarding for your team
Documents that describe your installation, not a generic product manual, and onboarding for operators, supervisors and administrators on every shift that uses the system.
For: Plant managers, supervisors, IT/OT administrators and training coordinators

Plant software rarely fails on the day it goes live. It fails months later, when the integrator has moved on, the supervisor who set up the downtime reasons has left, and the night shift was never shown how the board works. The screen on the wall becomes background, and the numbers stop being trusted. Documentation and onboarding are how OpenGXT prevents that: every system we build is written down in documents your team can read and change, and every role on every shift is shown how to use it.
This is not an optional extra. The documents are named deliverables in every engagement, and they are kept current by support and maintenance after go-live.
The documentation set
| Document | What it contains | Who uses it |
|---|---|---|
| Signal inventory | Every tag: asset, signal, source address, protocol, data type, unit, range, sample rate or trigger, owner, use | Controls engineers, maintenance, IT/OT |
| Data dictionary | Every KPI and its formula, the definitions behind it, reason trees and chart rules | Supervisors, CI, quality and maintenance leads |
| Data-flow and network diagram | What connects to what, in which direction, and where data is stored | IT and OT |
| Operator quick guides | One short guide for each screen, kept at the line | Operators |
| Administrator runbook | How to add a user, change a reason, add a machine, export data, and who to call | Your local owner and IT |
| Change log | Every change: date, who asked, what changed, why, who approved | Everyone |
Each is delivered in editable formats, so your team can update them without us. The signal inventory complements the asset inventory CISA recommends for OT owners, which it describes as “an organized, regularly updated list of an organization’s systems, hardware, and software.” The data dictionary states every formula in full; OEE, for example, follows the Lean Enterprise Institute’s definition of availability × performance × quality.
Onboarding by role
- Operators are shown at the line, on their own shift, on the screen they will use: reading the board, choosing a stop reason, filling in a check sheet. Sessions are short and practical.
- Supervisors learn the shift timeline, how to correct a mislabeled stop (the correction is logged), how to read the shift report and how to run the weekly review.
- Administrators work through the runbook: adding users, changing reasons, exporting data and adding a machine. They do each task themselves while we watch.
- Managers learn what each figure on the report means and where its definition lives.
After a change that affects how people work, such as a new screen, a new reason tree or a new line, we run a refresher session for the people it affects.
The questions buyers ask
Who trains the night shift?
We do, as part of onboarding. Sessions are scheduled on each shift that uses the system, and the onboarding plan says which are held at the line and which are remote. We also help you name a person on each shift who can answer the everyday questions once we have gone.
What happens when a supervisor leaves?
The knowledge does not leave with them. The reasons, rules and definitions are in the data dictionary, the screens are in the quick guides, and the attendance record shows who has been onboarded. Your local owner can onboard the replacement from the guides, or we can run a refresher.
Can our IT team run it without you?
Day-to-day administration, yes: users, reasons, exports and routine checks are all in the administrator runbook. Hosting, updates and patches stay with OpenGXT while you have a hosted subscription. If you ever leave, the written exit plan delivered at go-live lists what you receive, including a full data export, schemas, configurations and documentation, as set out on our open data page.
Example (fictional). For a fictional beverage bottler’s Line 2 filler, the data dictionary’s OEE entry states that planned production time excludes the 30-minute break from 10:00 to 10:30, that the ideal rate is 120 bottles per minute, and that only first-pass good bottles count as good. On the first-shift onboarding, an operator asks whether a planned changeover counts as downtime. The question goes into the open-questions log, the plant manager decides that it does, measured against its 25-minute standard, and the answer is written into the data dictionary. When the 12:18 changeover to 1-liter bottles takes 38 minutes, the shift report shows 13 minutes over standard, by a definition everyone has already seen. The operator quick guide for the stop-reason screen uses the 10:41 stop as its worked example: “Material”, then “Caps not delivered”.
What you provide and what you receive
| You provide | You receive |
|---|---|
| A list of trainees by role | The six documents above, in editable formats |
| Access to each shift that will use the system | Written or recorded guides for each screen |
| A local owner for the system | An attendance record |
| Time with operators at the line | An open-questions log, with answers |
| Your document templates, if guides should match them | Refresher sessions after changes |
Getting ready for go-live
The go-live readiness checklist covers the data, people, operations and safety-net questions to settle before the first live shift. If you are starting from scratch, the signal inventory worksheet is the first document in the set. Read how documents and onboarding fit into the six stages of how we work, or plan a pilot line.
Start with one line.
Tell us which line you want to understand and the question you ask after every shift. We reply with questions or a time to walk it with you.