Machine connectivity and industrial data

Getting signals out of PLCs, CNC controls, sensors and meters, and moving them to where they can be used without disturbing the machines that produce them.

For: Controls engineers, IT/OT leads and maintenance engineers

A miniature telephone-exchange patch panel on a wooden frame with colored patch cords looping between jacks, a tiny operator on a stool plugging in a yellow cord.

Machine connectivity and industrial data: articles

Every report a plant trusts starts with a signal someone could read. This section is about that first step: getting machine state, counts, faults, temperatures and meter readings out of PLCs, CNC controls, sensors and meters, and moving them to hosted software without disturbing the machines that produce them. It is written for controls engineers, IT and OT leads, and the maintenance engineers who often end up owning the connections.

The articles stay close to the open standards. OPC UA is published by the IEC as the IEC 62541 series. MQTT is an OASIS standard publish/subscribe protocol, and its version 5.0 dates from March 2019. Sparkplug version 3.0 is published as ISO/IEC 20237:2023. Modbus and MTConnect cover much of the older and the CNC equipment on a typical floor. Where an idea is an architecture pattern rather than a standard, such as a unified namespace, the articles say so.

Questions this section takes up

  • Which protocol fits which machine, and what should be checked on an older control before anything is promised?
  • What does Sparkplug add to plain MQTT, and when is it worth using?
  • How should assets and topics be named, using an ISA-95 style hierarchy, so that a second line or a second plant fits the same structure?
  • What does an edge gateway need from the plant network, and what should it never need?
  • What happens to data when the internet connection drops?
  • How much data will a set of signals produce, and how long should it be kept?

The work behind these articles is described in machine connectivity and cloud hosting. To apply it to your own equipment, start with the signal inventory worksheet and the machine connectivity checklist, name your topics with the topic namespace builder, and size the history with the data volume estimator.