Form each subgroup from a few consecutive parts made under the same conditions (same machine, same cavity or spindle, same setup, minutes apart) and let time pass between subgroups. Control limits are calculated from the variation inside the subgroups, so a subgroup should hold only short-term, common-cause variation, and the changes you want to detect should fall between subgroups. Four or five parts per subgroup and about 25 subgroups before the limits are fixed is the usual start; when measurements cannot sensibly be grouped, use an individuals chart.
This article explains why the limits depend on that choice, shows the two ways a poor subgroup design fails, and applies the rule to data that now arrives automatically from gauges, vision systems and machine controllers, including molds with several cavities and machines with several spindles. The worked examples are fictional and labeled as such.
What a rational subgroup is and why the limits depend on it
A rational subgroup is a small set of measurements taken close together under the same conditions, so that the only variation inside it is the short-term variation the process always has. Minitab’s documentation on subgroups defines a subgroup as “a group of units that are created under the same set of conditions” and says subgroups “represent a ‘snapshot’ of the process,” so “the measurements within a subgroup must be taken close together in time but still be independent of each other.”
The reason it matters is in the arithmetic. The NIST/SEMATECH e-Handbook builds the X-bar chart from the average range of the subgroups. The average range divided by a constant, d2, estimates the process standard deviation, and the limits are the grand average plus or minus A2 times the average range, where A2 = 3 / (d2 √n) and n is the subgroup size. Every number that sets the width of the limits comes from inside the subgroups.
So an X-bar chart asks one question: is the variation between subgroup averages larger than the variation within subgroups would predict? Whatever you put inside a subgroup becomes the yardstick. Whatever happens between subgroups is what the chart can detect. Designing subgroups is deciding which sources of variation belong in the yardstick and which you want to see.
ASQ’s description of control charts uses the two terms that frame the decision: common causes, “built into the process,” and special causes, “non-routine events.” A rational subgroup holds common causes only. The table below sorts typical sources for a molding or machining process.
| Source of variation | Inside the subgroup? | Why |
|---|---|---|
| Part-to-part variation over a few minutes | Yes | This is the common-cause noise the limits should reflect |
| Gauge repeatability | Yes, unavoidably | Every reading carries it; keep it small with a sound gauge |
| Cavity, spindle, nozzle or head differences | No | Each is a separate stream with its own mean |
| Tool wear over hours | No | A drift you want to see between subgroups |
| Material lot, setup, operator, shift | No | Changes you want to detect or explain |
| Machine warm-up after a stop | No | An event; sample after it, not across it |
Gauge repeatability sits inside every subgroup, which is one reason to check the gauge first. If it takes up most of the within-subgroup variation, the limits describe the gauge rather than the process; our article on running a gage R&R before SPC covers that study.
Two ways a poor subgroup design fails
A poor subgroup design fails in one of two directions. If the subgroup is too wide, it holds sources of variation that should sit between subgroups; the limits come out too wide and the chart rarely signals. If the subgroup is too narrow, it holds less variation than the process really has from minute to minute; the limits come out too tight and the chart signals all the time.
Too wide: a chart that never signals
A typical too-wide design takes one part from each of several streams and calls it a subgroup: one part from each cavity of a shot, one from each spindle, one from each filling head. The range inside such a subgroup is dominated by the differences between streams, so the average range is inflated and the limits spread apart. Because every subgroup contains every stream, the stream differences cancel out of the averages, which then sit quietly near the center line.
Software can see this pattern. Minitab’s Test 7 (fifteen points in a row within 1 sigma of the center line) “detects control limits that are too wide,” which Minitab says “are often caused by stratified data, which occur when a systematic source of variation is present within each subgroup.” The SAS/QC documentation says the same in Nelson’s terms: Tests 7 and 8 indicate stratification, and “Test 7 is positive when the observations in the subgroup always have multiple sources.”
Example (fictional). A fictional closure molder runs a four-cavity mold on Press 6 and charts cap height, nominal 12.00 mm. Each cavity runs at its own level: about 12.000 mm for cavity 1, 12.030 for cavity 2, 11.985 for cavity 3 and 12.015 for cavity 4, each with a part-to-part standard deviation of 0.010 mm. The first design takes one cap from each cavity of a shot as a subgroup of four. Over 25 subgroups the average range is 0.0512 mm, so the estimated standard deviation is 0.0512 ÷ 2.059 = 0.0249 mm, two and a half times the real part-to-part figure. The X-bar limits are 12.009 ± 0.729 × 0.0512, which is 11.971 to 12.046 mm. The true standard deviation of these averages is only 0.010 ÷ √4 = 0.005 mm, so the limits sit about 7.5 true standard errors from the center instead of 3. In the 25 subgroups used to set the limits, every average fell within 1 estimated sigma of the center line, the Test 7 pattern.
Then a vent starts to clog and every cavity runs 0.020 mm taller from subgroup 16 onward. The averages rise to between 12.015 and 12.034 mm and never cross the upper limit. A four-out-of-five zone rule would fire at subgroup 20 and a nine-in-a-row rule at subgroup 24, if either were turned on. The second design charts cavity 2 alone, with subgroups of four consecutive shots. Its average range is 0.0234 mm, its limits are 12.013 to 12.047 mm, and subgroup 16, the first after the shift, plots above the upper limit. Eight of the ten subgroups after the shift do.
Too narrow: a chart that always signals
The opposite failure comes with automatic data. Suppose a laser gauge on a fictional profile extrusion line takes five readings of a tube’s outside diameter within one second, every 10 minutes. Inside a subgroup the readings vary with a standard deviation of, say, 0.004 mm. From one subgroup to the next, the diameter also wanders with the melt temperature, with a standard deviation of 0.008 mm, and the plant has accepted that wander as part of how the line runs.
For illustration, the arithmetic goes like this. The X-bar limits are set by the within-subgroup figure: ±3 × 0.004 ÷ √5, about ±0.0054 mm. The subgroup averages actually vary with a standard deviation of about 0.0082 mm (the wander plus the averaged short-term noise). About half of all subgroups, 51 percent, then plot outside the limits, although nothing new has happened. A chart that flags half its points teaches operators to ignore it.
There are three honest fixes. Remove the wander, if it is worth the engineering effort. Spread the subgroup over a longer window, so it includes the minute-to-minute variation you accept, as Minitab suggests: “If you know that few changes occur within a certain time interval, collect the subgroup data during that time period.” Or chart the subgroup averages as individuals with their own moving-range limits, alongside a range chart for the within-subgroup spread. Minitab’s documentation describes this three-way display as an I-MR-R/S (between/within) chart, used “to monitor the mean of your process and the variation between and within subgroups.”
How many parts per subgroup
Four or five parts is the usual subgroup size, and the numbers show why. The NIST handbook notes that “a typical sample size is 4 or 5,” and Minitab’s documentation says that “for initial process studies, subgroups of 4 or 5 units that are collected every hour or so are common.” Larger subgroups catch smaller shifts in fewer subgroups, but each additional part buys less, and a large subgroup collected over a long stretch of time stops being a snapshot.
The figure below lists the constants for subgroups of 2 to 10 and the detection power for a sustained shift of one process standard deviation. The constants A2, D3 and D4 are as tabled in the NIST handbook; d2 is from Minitab’s table of unbiasing constants. The detection columns are computed from the normal distribution for an X-bar chart with 3-sigma limits and Rule 1 only.
| Subgroup size n | A2 | D3 | D4 | d2 | Chance the next subgroup shows a 1-sigma shift | Average subgroups to detect | Parts measured to detect |
|---|---|---|---|---|---|---|---|
| 1 (individuals) | 2.66 × average moving range | 0 | 3.267 (moving range) | 1.128 (n = 2) | 2.3% | 44 | 44 |
| 2 | 1.880 | 0 | 3.267 | 1.128 | 5.6% | 17.7 | 35 |
| 3 | 1.023 | 0 | 2.575 | 1.693 | 10.2% | 9.8 | 29 |
| 4 | 0.729 | 0 | 2.282 | 2.059 | 15.9% | 6.3 | 25 |
| 5 | 0.577 | 0 | 2.115 | 2.326 | 22.2% | 4.5 | 22 |
| 6 | 0.483 | 0 | 2.004 | 2.534 | 29.1% | 3.4 | 21 |
| 7 | 0.419 | 0.076 | 1.924 | 2.704 | 36.2% | 2.8 | 19 |
| 8 | 0.373 | 0.136 | 1.864 | 2.847 | 43.2% | 2.3 | 19 |
| 9 | 0.337 | 0.184 | 1.816 | 2.970 | 50.0% | 2.0 | 18 |
| 10 | 0.308 | 0.223 | 1.777 | 3.078 | 56.4% | 1.8 | 18 |
Read the table in two directions. Per subgroup, a bigger n detects faster: a subgroup of five shows a 1-sigma shift on the very next subgroup about 22 percent of the time, a single reading about 2 percent of the time. Per part measured, the gain flattens: going from one to five parts per subgroup halves the parts measured before detection (44 to 22), but going from five to ten saves only four more.
The range is a fine estimate of spread at these sizes. NIST says “the range approach is quite satisfactory for sample sizes up to around 10” and that “for larger sample sizes, using subgroup standard deviations is preferable.” Its relative-efficiency table puts the range at 0.955 of the standard-deviation method for n = 5, so “not much is lost by using the range” at the typical sizes.
Some practical rules follow:
- Start at four or five for any characteristic you measure by hand or with a gauge you load part by part.
- Go to two or three when each measurement is slow or destructive but parts can still be grouped, and accept slower detection.
- Go above ten only with automatic gauges, use an X-bar and S chart, and keep the subgroup inside a short time window.
- Use one when parts cannot logically be grouped, as covered later in this article.
A larger subgroup is never a cure for a poor design. Minitab gives the warning plainly: “if you choose the subgroup size as all the measurements taken on one day, any changes within a day might average each other out and remain undetected.”
How often to take a subgroup, and how many before fixing limits
Subgroup frequency sets how long a shift can run before the chart sees it. Choose it from how fast the process can change and how much product you can afford to make between a change and its detection, then add a subgroup after every event that can move the process.
The arithmetic is simple. With subgroups of five and Rule 1 only, a 1-sigma shift takes about 4.5 subgroups to show on average. For example, at one subgroup an hour that is about four and a half hours of production; at one every 15 minutes, a little over an hour. Minitab notes that industry “prefers small, frequent samples to signal a process shift before too much defective product is made.”
Example (fictional). Press 6 at the fictional closure molder runs a 15-second cycle, so cavity 2 makes 240 caps an hour. With subgroups of four consecutive shots from cavity 2, a 1-sigma shift takes about 6.3 subgroups to show with Rule 1 alone. At one subgroup every 15 minutes, that is about 95 minutes, or roughly 380 caps from cavity 2 made after the shift and before the chart reacts. At one subgroup an hour it would be about six hours and 1,500 caps. The quality engineer compares those 380 caps with what the plant can contain (the caps between two hourly box changes are held anyway) and settles on 15 minutes. Adding a run rule would cut the wait further, at the false-alarm cost described in our article on alarm rules.
Clock-based subgroups miss the moments when processes usually move. Changeovers, tool changes, material lot changes, restarts after a long stop and the first hour of a shift are the events that tend to shift a mean. When the machine’s own data marks those events (a changeover recorded on the production screen, a tool-change count from the controller, a lot scan at the hopper), the subgroup schedule can include one subgroup after each. Keep the clock-based subgroups as well, so the chart does not only ever see the process right after a disturbance.
How many subgroups before the limits are fixed? The NIST handbook quotes Shewhart’s rule of thumb that a state of control should not be concluded until there is “a sequence of not less than twenty five samples of size four that are in control.” Minitab’s guidance is similar: “Usually, 100 observations or more (for example 25 subgroups with 4 observations each) is enough,” collected “for a duration that is long enough to ensure that major sources of variation have the chance to occur.” ASQ calls limits computed from the first 20 points “conditional limits,” to be recalculated once there are at least 20 sequential points from a period in control.
The 25 subgroups should cover the conditions the chart will live with: several shifts, operators, material lots and at least one restart. Twenty-five subgroups taken on one quiet afternoon produce limits that alarm the first time a second shift runs the press.
Once fixed, the limits stay fixed. NIST’s reasons to recalculate are specific: at least 30 more data points with no known process change, a major process change, or a known, preventable event that changed how the process behaves.
Forming subgroups from automatic gauge and machine data
Automatic data changes the practical question from “which parts do we pull?” to “which readings do we group?” A gauge that measures every part, a vision system, a measuring machine that writes report files or an on-machine probe can supply far more readings than a chart needs. The rule stays the same: consecutive parts from one stream, close in time, with time between subgroups.
Three schemes work well:
- Clock-anchored consecutive parts. At each interval, the next n parts from one stream form a subgroup: for example, five consecutive caps from cavity 2 every 15 minutes. All other readings stay in the record for traceability, containment and capability work, but they are not plotted.
- Count-anchored consecutive parts. Every Nth part starts a subgroup, for example parts 1 to 5 of every 500. This ties sampling to output, which suits lines whose rate varies.
- Event-anchored subgroups. One extra subgroup after each changeover, tool change, lot change or restart, flagged as such so it can be reviewed separately.
Time-based or part-based?
Clock-anchored and count-anchored subgroups answer slightly different questions. A clock-anchored plan samples the process at even intervals of time, which suits causes that move with time: warm-up, ambient temperature, coolant concentration, the start of a shift. A count-anchored plan samples at even intervals of output, which suits causes that move with use: tool wear, mold deposits, consumable depletion. On a line whose rate is steady the two are nearly the same. On a line that runs at different rates for different products, or stops often, they diverge, and a clock-anchored plan takes many subgroups from slow, easy running and few from fast running. Pick the anchor that matches the cause you worry about most, and write the choice into the plan.
Two schemes cause trouble. Grouping “all parts in the last hour” makes the subgroup too wide in time and size, so drifts inside the hour average away. Grouping readings taken within a second or two from a slowly wandering process makes the subgroup too narrow, the extrusion problem described above.
Process tags are a different case from part measurements. A melt temperature, a pressure or a torque value read every second is not a part; consecutive readings are often autocorrelated, so a subgroup of consecutive readings is almost always too narrow. For tags, chart spaced individual readings or interval averages, and check for autocorrelation before turning on run rules. Our article on Western Electric and Nelson rules shows how quickly autocorrelation multiplies false alarms.
Whatever the scheme, every reading needs enough context to be grouped correctly later:
| Field | Why the subgroup needs it |
|---|---|
| Timestamp | Orders readings and sets the time window |
| Part sequence or serial number | Confirms parts are consecutive |
| Machine and stream (cavity, spindle, nozzle, head, lane) | Keeps streams apart |
| Product or part number and revision | Prevents mixing products in one subgroup |
| Gauge ID | Ties the reading to a gauge with a known measurement study |
| Material lot | Explains shifts between subgroups |
| Event flags (changeover, tool change, restart) | Marks event-anchored subgroups |
| Operator, for manual entries | Explains differences between people |
Keep the subgroup size fixed
Automatic sampling meets interruptions: the press stops after three of four shots, a part is pulled for a destructive test, a gauge reading fails. Keep the subgroup size fixed anyway. Discard an incomplete subgroup and take a fresh one after the restart, flagged as an event subgroup. A subgroup that straddles a stop holds the restart inside it, which is exactly the kind of variation that belongs between subgroups. Charts with varying subgroup sizes need limits that change from point to point, which operators find hard to read and which complicate the run and zone rules.
Stream identity is the field to check first. A vision system that reports a cap height without its cavity number makes a per-cavity chart impossible, and no software can recover it afterwards. Where readings are entered by hand, the same fields belong on the form; our article on digital check sheets covers the entry side.
Cavities, spindles, nozzles and heads: keeping streams apart
A multi-stream process is any process where several parallel paths make the same part: cavities in a mold, spindles on a multi-spindle machine, nozzles on a filler, heads on a capper, lanes on a packaging machine. Each stream can have its own mean, and the default is to keep streams apart: one chart per stream, with subgroups of consecutive parts from that stream.
Mixing streams produces recognizable patterns, which is useful when you inherit an existing chart. One part from every stream in each subgroup gives the hugging pattern of Test 7. Subgroups taken from one stream at a time, rotating through the streams, give the opposite: SAS notes that “Test 8 is positive when the subgroups are taken from one source at a time,” because the averages jump between stream levels and avoid the center. Two streams sampled alternately give the sawtooth of Test 4, which Nelson described as “a systematic effect such as produced by two machines, spindles, operators or vendors used alternately.”
The right design depends on how many streams there are:
| Number of streams | Practical design |
|---|---|
| 2 to 8 | One chart per stream, subgroups of consecutive parts from that stream |
| 8 to 16 | Per-stream charts for the critical characteristic; for others, a rotating per-stream sample reviewed as separate charts, not one combined chart |
| More than 16 (large molds, rotary fillers) | One chart of the per-cycle average across all streams, to catch shifts that move every stream; plus a chart of each cycle’s highest and lowest stream, to catch one stream drifting away; plus a periodic study of every stream |
The per-cycle average in the last row is a legitimate chart, but its question is different: it watches the whole tool or machine, not any one cavity. Its limits should come from the variation of those averages over time (an individuals chart of the cycle averages), not from the spread across streams inside a cycle, which is the too-wide design again.
The streams’ own differences are worth a separate look. A cavity running 0.030 mm above its neighbors is not a special cause on any control chart, but it may be the reason the capability numbers are poor. Tool and mold makers can sometimes correct a persistent offset, and that improvement only shows up if the streams are charted separately. Our plastics and packaging page describes how presses, molds and active cavities are recorded, which is the starting point for per-cavity charts.
When an individuals chart is the better choice
Use an individuals chart (an I-MR chart: individual values plus the moving range of two consecutive values) when measurements cannot logically be grouped. Minitab lists the usual conditions, including when “each sample represents one distinct batch,” when “there are long time intervals between each sample,” when “sampling or testing is destructive and/or expensive,” when “output is continuous and homogenous,” and when “there is a long cycle time for production.”
The NIST handbook’s page on individuals charts gives the formulas. The moving range is the absolute difference between consecutive values, and the limits are the average of the values plus or minus 3 times the average moving range divided by 1.128, the value of d2 for n = 2. Three divided by 1.128 is about 2.66, which is the constant many shops write on the chart. The moving range chart’s upper limit is 3.267 times the average moving range, D4 for n = 2. NIST’s worked example, ten batches of a new process monitored for flow rate, has an average of 50.81 and an average moving range of 1.8778, giving limits of 45.8159 and 55.8041.
Example (fictional). A fictional machine shop finishes a large pump housing every 40 minutes and measures one bore on a coordinate measuring machine. Grouping four housings would span almost three hours and two tool changes, so the engineer uses an individuals chart. Over the first 25 housings the bore averages 85.012 mm and the average moving range is 0.0045 mm. The limits are 85.012 ± 2.66 × 0.0045, which is 85.000 to 85.024 mm, and the moving range chart’s upper limit is 3.267 × 0.0045, about 0.0147 mm. The moving ranges are computed only between consecutive housings from the same setup, so a fixture change does not appear as one large moving range.
An individuals chart has costs. As the table above shows, it detects a 1-sigma shift in about 44 points on average, against 4.5 subgroups for subgroups of five. It is more sensitive to non-normal data, because each point is a single reading rather than an average. And with autocorrelated data, the moving ranges understate the spread, so the limits come out too tight.
Automated 100 percent inspection does not by itself call for an individuals chart. If a gauge measures every part on a fast line, consecutive parts from one stream still make a good rational subgroup, and an X-bar chart will detect a small shift far sooner. Individuals charts suit the slow end of the scale: a large part every 20 minutes, one batch per shift, one lab result per lot. For machine shops where no part number runs long enough to fill subgroups, the individuals chart is the base of the deviation-from-nominal method in our article on short-run SPC.
How subgroup design changes Cp and Cpk
Subgroup design changes capability numbers as well as alarms, because Cp and Cpk use the within-subgroup standard deviation. The process capability calculator says so in its note: use the within-subgroup standard deviation for Cp and Cpk, and the overall standard deviation for Pp and Ppk. A design that inflates or shrinks the within-subgroup figure moves Cpk with it.
The calculator’s default example shows how much. With specification limits of 9.95 and 10.05 mm, a mean of 10.012 mm and a within-subgroup standard deviation of 0.012 mm, Cpk is 1.06. For example, suppose the same process were charted with mixed-stream subgroups that inflated the estimate to 0.030 mm: Cpk would read 0.42, and the process would look incapable. Suppose instead that subgroups of readings taken within a second shrank the estimate to 0.006 mm: Cpk would read 2.11, and the process would look far better than the parts are.
Comparing the two standard deviations is a quick diagnostic. If the overall standard deviation is much larger than the within-subgroup one, there is variation between subgroups: either the process is not stable, or the subgroups are too narrow to hold the variation the process always has. If the two are close, the process is behaving like its subgroups. The NIST handbook on capability adds two cautions: the indices assume normally distributed data, and most capability estimates are valid only if the sample is “large enough,” which it says “is generally thought to be about 50 independent data values.”
Capability comes after stability. Report Cp and Cpk only for a characteristic whose chart has been in control against fixed limits, and say which standard deviation was used.
Mistakes that break subgroups in automatic data
In automatic systems, subgroups can also be broken by how readings are filtered and joined before they reach the chart, not by the chart itself. Each of the mistakes below produces limits that look plausible and are wrong.
- Charting only accepted parts. If an inline gauge rejects parts outside the specification and only the accepted parts reach the chart, the distribution is cut off at the specification limits. The ranges shrink, the limits tighten, and Cpk is overstated. Chart every measured part, including rejects, and keep the accept or reject decision as a separate field.
- Counting remeasured parts twice. When an operator remeasures a doubtful part, the second reading often arrives as a new part. Two readings of one part in a subgroup understate part-to-part variation. Carry a part serial or sequence number, and mark remeasurements so only one reading per part enters the subgroup.
- Subgroups that straddle a changeover or a product change. A subgroup clock that runs through a changeover mixes the old product with the new. Close any open subgroup at a product or setup change, and start the clock again after the first approved part.
- Streams merged by an upstream system. A gauge that reports per cavity may feed a historian or spreadsheet that averages the cavities before SPC sees them. Check the raw data path from the gauge to the chart, and keep the stream ID at every step.
- Rounding that hides variation. A reading stored to two decimals when the variation lives in the third gives many identical values and zero ranges. Store readings at the gauge’s full resolution and round only for display.
- Time stamps from the wrong clock. Readings stamped when a file is imported rather than when the part was measured can put parts from different hours into one subgroup. Use the measurement time from the gauge or controller, and keep gateway and server clocks synchronized.
A quick test catches several of these at once. Plot the within-subgroup ranges in time order next to the machine’s events. Ranges that jump at changeovers point to mistake 3, ranges that are often zero point to mistake 5, and ranges much larger than a single cavity’s spread point to merged streams.
Write the subgroup plan down
A subgroup plan is a short document, one row per characteristic, that anyone can check against the chart. It prevents a quiet drift in SPC programs: a subgroup design that changes quietly when a new gauge or a new person arrives.
| Plan item | Example entry (fictional Press 6, cap height) |
|---|---|
| Characteristic and unit | Cap height, mm |
| Stream | Cavity 2 (one plan per cavity) |
| Chart type | X-bar and R |
| Subgroup size | 4 consecutive shots from cavity 2 |
| Sampling rule | Every 15 minutes, plus one subgroup after each mold change, lot change or restart |
| Sigma estimate | Average range ÷ d2 (2.059) |
| Limits basis | 25 subgroups over three shifts and two material lots, dated and versioned |
| Recalculation rule | NIST reasons only: 30 more points with no change, a major process change, or a known event |
| Rules enabled | Rule 1 + 9 in a row on averages; Rule 1 on ranges |
| Reaction plan | First checks: gauge, cavity vent, material lot, mold temperature |
| Owner | Process engineer, Press 6 |
The plan belongs in the data dictionary with the chart formulas, so a reviewer can see why a chart looks the way it does. Our quality data service records each measurement with its line, shift, product and machine state, and the subgroup plan goes into the data dictionary before the first chart is drawn, during the survey and configuration stages of a project.
Checklist before you fix the limits
Before the limits on a new chart are frozen, check each of these:
- Each subgroup holds consecutive parts from one stream, one product and one setup.
- The subgroup is taken within a short window, and there is time between subgroups.
- Subgroup size is four or five unless there is a written reason for another size.
- At least 25 subgroups cover several shifts, lots and restarts.
- Test 7 (hugging) and Test 8 (avoiding the center) have been checked on the Phase I data.
- The gauge has passed a measurement system study, and its ID is on every reading.
- Stream ID, product, timestamp and event flags are captured with each reading.
- Within-subgroup and overall standard deviations have been compared.
- The subgroup plan, the limits and their version are in the data dictionary.
OpenGXT builds, hosts and maintains cloud software for manufacturers, including SPC charts fed from gauges and machine data. If you want to test a subgroup design on one press or one line before rolling it out, plan a pilot line around the characteristic that causes the most trouble.
