Preventive maintenance compliance calculator

Count the PM work orders that came due, how many were done inside the compliance window and how many late. The calculator turns them into the four numbers a monthly maintenance review needs.

For: Maintenance managers, maintenance planners and reliability leads

A miniature wall board of hooks hung with blank two-color tags, most turned to green and a few to red, and a tiny mechanic flipping one tag from red to green.

Calculator

Fictional example values are filled in. Replace them with your own; results update as you type. Nothing you enter leaves your browser.

Results

PM compliance (completed within the window)
85.0%
PM completion including late work
92.5%
PM work orders missed
9
Preventive share of maintenance hours, PM ÷ (PM + corrective)
57.7%

State the compliance window you use (for example, completed by the due date, or within 10% of the PM interval) and keep it fixed so months can be compared.

A preventive maintenance schedule only protects equipment if the work is done close to when it is due. PM compliance measures exactly that: of the PM work orders that came due in a period, how many were completed inside the window you allow. It is one of the first numbers a maintenance manager is asked for, and one of the easiest to inflate without meaning to.

How the calculation works

The calculator takes five counts from one period, usually a calendar month:

  • PM compliance = PMs completed within the window ÷ PMs due.
  • PM completion including late work = (completed within the window + completed late) ÷ PMs due.
  • PM work orders missed = PMs due − completed within the window − completed late.
  • Preventive share of maintenance hours = PM labor hours ÷ (PM hours + corrective hours).

The last result divides preventive hours by all maintenance hours. A planned corrective job, such as a repair scheduled for the weekend, falls on the corrective side, so read it as the preventive share of labor, not as a measure of how well work is planned.

Example (fictional). A fictional plant’s maintenance team has 120 PM work orders due in the month. It completes 102 inside the compliance window and 9 after it. Technicians log 300 hours of preventive work and 220 hours of corrective (reactive) work. The calculator returns:

Result Value
PM compliance (completed within the window) 85.0%
PM completion including late work 92.5%
PM work orders missed 9
Preventive share of maintenance hours, PM ÷ (PM + corrective) 57.7%

The headline is 85.0%, but the review starts with the 18 work orders behind the other 15%: the 9 done late and the 9 never done. Which assets were they on, and why did they slip: the line was not released for the work, the parts were not on the shelf, or technicians were pulled to breakdowns? With 220 corrective hours in the month, the last reason is worth checking first.

Choose the compliance window and keep it

The note under the results asks you to state your window and keep it fixed. The usual choices:

  • By the due date. Strict and simple, but work done one day late counts the same as work done three weeks late.
  • A tolerance around the interval. For example, within 10% of the PM interval, so a 30-day PM counts as on time within 3 days either side of its due date. This suits monthly and quarterly tasks.
  • A usage window. For PMs triggered by run hours or cycle counts, the window is set in hours or cycles, not days.

Write the window down next to the formula, in the same document as your other maintenance definitions, so this month can be compared with the same month next year.

What counts as due

Compliance figures most often go wrong in the denominator, not the numerator:

  • Rescheduled PMs. Moving a due date before it passes makes the work order disappear from “due”. Count against the original due date, or report reschedules as a separate number.
  • Cancelled PMs. A PM cancelled because the asset was idle or removed can fairly be excluded. One cancelled because nobody had time is a miss.
  • Closed without the work. A work order closed with tasks skipped, or closed in a batch at month end, counts as complete in the system and protects nothing.
  • Equal weight. A ten-minute lubrication route and a gearbox inspection each count as one work order. Report compliance for critical assets separately, so a pile of small routes cannot hide a missed critical task.

Who fills it in and how to act on it

The maintenance planner pulls the counts from the CMMS, or from the PM calendar where there is no CMMS, once a period. The maintenance manager reviews them with production, because many missed PMs are really access problems. Act on the list, not the percentage: reschedule missed PMs on critical assets first, agree recurring windows with production for assets that are never released, and check whether breakdowns rose on the assets that missed their PMs. The MTBF and MTTR calculator shows failure frequency on those assets, and the downtime cost calculator puts a price on the stops behind the corrective hours.

Common mistakes

  • Counting late work as on time because it was done in the same month.
  • Changing the window from one month to the next, so the trend means nothing.
  • Reading a high compliance figure on its own while corrective hours keep rising.
  • Keeping calendar intervals on machines whose running hours vary widely from month to month.

Where OpenGXT fits

OpenGXT’s maintenance software reads run hours and cycle counts from the machines so PMs can be triggered by actual use, and reports PM compliance, MTBF and MTTR from the work orders. It does not replace an existing CMMS: where you have one, it reads or sends records through the CMMS’s API or files, and where you have none, it offers simple work requests. The run-hour and count signals it needs go on your signal inventory worksheet.

Start with one line.

Tell us which line you want to understand and the question you ask after every shift. We reply with questions or a time to walk it with you.