Maintenance and reliability
Preventive and condition-based maintenance, failure records and the metrics that show progress, built on what the machines actually did.
For: Maintenance managers, reliability engineers and maintenance planners

Maintenance and reliability: articles
- Issue:
Ranking equipment criticality in a small plant
How do we rank which machines matter most so maintenance effort, spares and monitoring go to the right assets first?
- Issue:
Motor current or vibration: which condition signal to monitor
For a given motor-driven asset, should we monitor current, vibration or both, and what can each detect?
- Issue:
Usage-based maintenance from machine runtime and cycle counts
How do we trigger PM from real runtime hours and cycle counts instead of the calendar, and where do trustworthy counts come from?
- Issue:
How to set preventive maintenance frequency with evidence
How often should each preventive maintenance task run, and how do we adjust the interval with evidence?
- Issue:
Condition-based vs predictive maintenance for a small plant
What is the real difference between condition-based and predictive maintenance, and which can a small plant run first?
Maintenance teams already know which machines give trouble. What they often lack is a record that shows it: run hours instead of calendar days, failures counted the same way every time, and repair times that are not reconstructed from memory at the end of the month. This section is for maintenance managers, reliability engineers and planners who want their decisions to rest on what the machines actually did.
The articles start from the asset list. CISA’s guidance on OT asset inventories recommends classifying assets by function and criticality, and the same list, with run hours and cycle counts attached, is the base for usage-based preventive maintenance. From there the articles cover condition alerts on temperature, vibration and motor current, how to define a failure so that MTBF and MTTR mean something, and how to measure PM compliance. They describe methods a plant can check against its own records, and they do not promise to predict failures.
Most plants already have a CMMS, or a spreadsheet doing that job. The articles assume it stays, and look at how machine data can feed it with meter readings and work requests rather than replace it.
Questions this section takes up
- Should a PM task follow the calendar, run hours or cycle counts?
- How do you count a failure so that MTBF can be compared from month to month?
- What makes a condition alert useful rather than noise, and who should receive it?
- How do you measure PM compliance in a way that does not hide late work?
- How can run hours and alerts reach the CMMS you already use?
Related services and tools
The work behind these articles is described in maintenance software, and the signals it relies on come through machine connectivity. To run the numbers on your own records, use the MTBF and MTTR calculator, the PM compliance calculator and the downtime cost calculator.
Start with one line.
Tell us which line you want to understand and the question you ask after every shift. We reply with questions or a time to walk it with you.