OpenGXT homePlan a pilot line
Menu

Equipment data for distribution centers

Uptime and faults for every conveyor zone and sorter by shift, dock door open time and building energy, read from the equipment controls. Orders, inventory and the WMS stay out of scope.

For: DC general managers, maintenance and facilities managers, and controls engineers

A miniature conveyor loop carrying tiny cardboard parcels, a yellow diverter arm pushing one parcel onto a side lane, a tiny figure in a safety vest watching from a short mezzanine stair.

When a merge jams or a sorter faults at the busiest hour of the shift, the people on the floor know within seconds. The conveyor screen shows the current fault. What it rarely shows is the history: which zone stopped most often this week, for how long, on which shift, and whether the same photo-eye keeps causing it. That history is what maintenance and facilities need to plan their work.

OpenGXT builds hosted software that reads the equipment in a distribution center, turns its signals into uptime and fault reports by zone and shift, and keeps it running after go-live.

Equipment only

This page is about the equipment in a distribution center and nothing else. OpenGXT does not do inventory management, order or shipment tracking, WMS or TMS work, labor tracking, slotting, barcodes or RFID. The software does not read or write orders, inventory or labor data, and it does not change how the conveyor routes or sorts cartons. Those stay with the systems and people who run them today.

What the software reads

  • Conveyor zones: running, stopped, faulted, emergency stop, and blocked or starved (stopped because the next zone is full or the previous one is empty).
  • Jams and faults: photo-eye jam faults and drive fault codes, with zone, time and length.
  • Sorters: running state, jams and faults, and carton counts where the sorter controller keeps them, used only as a throughput measure.
  • Motor current on key drives, where the drives are networked or a current sensor is added, as a condition signal for maintenance software.
  • Dock doors: open and close cycles and open time per door, from door limit switches or added sensors.
  • Battery chargers: charging state, charge time and faults, and energy where chargers are metered.
  • HVAC and lighting: run status and electricity from meters, for energy monitoring.

Questions DCs ask first

Can you read our conveyor PLCs?

We find out zone by zone. Whether a controller exposes an OPC UA server, offers Modbus TCP or needs an added interface depends on the controller and on how the system was built, so we check during the equipment and data survey. The integrator who built the conveyor system often holds the tag list and network drawings, and asking for them early saves time. Access is read-only by default, and nothing in a PLC program is changed without your controls engineer. The security page explains how the gateway connects outbound only, so no inbound ports are opened on your network.

Will this touch the WMS?

No. The gateway reads equipment controllers and meters. It does not connect to the WMS, and the software does not exchange data with it. When a report needs to know which shift was working, it uses your shift calendar.

Can we see faults by zone and shift?

Yes. Your zone map becomes the equipment hierarchy in the software, in the same ISA-95 style structure we use for plants: site, area (receiving, sortation, shipping), zone and asset. Each fault is recorded against its zone with a start time and a length, so the shift report ranks zones by faulted minutes and by number of jams, and a weekly view shows which zones and which shifts repeat.

Blocked is not faulted

Conveyors stop in chains. When the sorter faults, the zones feeding it fill up and stop on a full photo-eye a minute later. If every stopped zone counted as a fault, the Pareto chart would spread one problem across five zones. The software records a zone stopped by a full or empty neighbor as blocked or starved, and keeps the faulted minutes on the zone where the stop began. That rule, like every other definition, is written in the data dictionary so maintenance and operations read the report the same way.

Example (fictional). A fictional regional distribution center runs second shift from 15:00 to 23:30 with a 30-minute break: 480 minutes of scheduled conveyor time. The shift report lists faulted minutes by zone: the merge (Zone B) 41 minutes across 14 jams; the sorter (Zone C) 22 minutes across 6 faults, one of them a 15-minute drive overcurrent fault; the shipping takeaway (Zone D) 20 minutes across 5 faults; and receiving (Zone A) 9 minutes across 3 jams. Uptime by zone is 91.5% for the merge (439 ÷ 480), 95.4% for the sorter, 95.8% for the takeaway and 98.1% for receiving. Minutes when a zone stood still because the zone after it was full are shown as blocked, not faulted, so the merge’s jams stay at the top of the Pareto instead of being shared out among the zones behind it. The maintenance lead takes two items into the next day: the merge’s photo-eyes and guides, where jams average just under 3 minutes each, and the current trend on the sorter’s main drive before its overcurrent fault. The door report shows Door 7 with the longest open time on the dock, 214 minutes over the shift, and facilities decide whether that is a scheduling question or a door seal question.

What you provide and what you receive

You provide You receive
Controls documentation: tag lists, network drawings and the integrator’s contact A signal inventory and connection plan, zone by zone
A zone map of the building An equipment hierarchy by area, zone and asset
Fault code lists for conveyors, sorters and drives Fault Pareto by zone and shift, with jam counts and minutes
Locations of doors, chargers and utility meters Door open-time, charger and energy dashboards
Maintenance and facilities contacts Alerts routed to the right people, onboarding and support after go-live

Starting with one area

A pilot usually starts with one area: the sortation loop, or the merge everyone already suspects. The written pilot plan names the zones, the signals, the fault codes and the acceptance measures: do the jam counts match the alarm history on the conveyor screen where one is kept, and do the zone states match what the maintenance technician saw. Once faults are recorded the same way every shift, the MTBF and MTTR calculator shows how to turn them into reliability measures for each zone. See how a pilot for one area is set up, or how the gateway is configured in machine connectivity.

Start with one line.

Tell us which line you want to understand and the question you ask after every shift. We reply with questions or a time to walk it with you.