OpenGXT homePlan a pilot line
Menu

Line performance for food and beverage plants

See what each machine on a processing or packaging line did on every shift, with sanitation counted as planned time, changeovers measured against their standards and utilities per unit beside the output.

For: Plant managers, operations and CI leads, and maintenance managers in food and beverage

A miniature stainless steel mixing kettle with a small catwalk and railing, a tiny worker in a white coat and hairnet on the catwalk looking into it, a hose coiled on a hook.

A packaging line in a food or beverage plant is a chain of machines that each stop for their own reasons. The filler waits on the capper, the labeler starves when the filler is down, and a case packer jam backs the whole line up. Add frequent changeovers between products and sizes, and scheduled sanitation that can take a large share of the day, and it becomes hard to tell from a shift log where the time went.

OpenGXT builds hosted software that reads each machine’s state and counts, turns them into a line view for every shift, and keeps it running after go-live. It covers packaging equipment such as fillers, cappers, labelers, case packers and palletizers, and process equipment such as kettles, mixers and ovens wherever a state, a count or a temperature can be read.

What the software reads

  • Machine state on each machine: running, idle (starved or blocked), down, or in a planned stop. Machines that follow the PackML state model, developed by OMAC and adopted by ISA as TR88.00.02, already report standard states, which shortens configuration. Others are read from a run signal, a count and a fault word.
  • Counts and rejects: infeed and outfeed counts, and reject counts from inspection points such as fill-level, cap and label checks, where the machine records them.
  • Line speed against the rated speed for the product running.
  • Fault codes with their times, so each stop can be tied to its cause.
  • Utilities: electricity, water and compressed air from meters on the line or the panels that feed it.

The example project walks through one packaging line from the first signal to the first shift report.

Questions plants ask first

Can we separate sanitation from downtime?

Yes. Scheduled sanitation and clean-in-place (CIP) cycles are entered as named planned stops, the same way as breaks. They are left out of planned production time, so they do not lower availability, and they are still recorded in minutes, so you can see whether sanitation is getting longer. What happens when a sanitation runs past its window is a decision we write down with you: some plants count the overrun as downtime, others keep it as planned time and track it separately. Either way, the rule goes into the data dictionary and does not change without a logged decision.

Does it handle washdown areas?

The gateway sits in a dry location such as a control panel or an electrical room, not on the washdown floor, and most signals come from controllers that are already enclosed. Where a new sensor or a screen is needed in a washdown area, it is chosen with your maintenance and sanitation teams for that environment, and any wiring is done by your electricians or licensed contractors.

Is this traceability?

No. OpenGXT does not provide lot traceability, food safety records, or software for FSMA or HACCP programs, and nothing on this page is a compliance claim. The software records equipment states, counts, rejects and utilities by line and shift. Keep lot records and food safety documentation in the systems that do that work today.

Changeovers and rejects

Changeovers are measured from the last good unit of one product to the first good unit of the next, and compared with a standard for each type: a size change, a flavor change, a label change. The changeover report lists every changeover with its type, its length and the minutes over standard, so the ones worth studying stand out.

Rejects are counted by machine and by reason where the machine provides a reason, and they are also shown as minutes of lost output. That puts rejects and stops on the same scale, so a supervisor can see which one cost more on a given shift.

Energy and water per unit

With energy monitoring, electricity, water and compressed air are divided by good units for the same line and shift. A plant can then see which products and which shifts use more per case, and whether a line keeps drawing power while it waits. The energy per unit calculator shows the arithmetic.

Example (fictional). A fictional beverage bottler’s Line 2 filler runs first shift, 06:00 to 14:00 (480 minutes), with a planned 30-minute break from 10:00 to 10:30. Three stops cost 75 minutes: a bottle feed jam at 07:41 (11 minutes, down), waiting on caps from the warehouse at 10:41 (26 minutes, idle) and a changeover to 1-liter bottles at 12:18 (38 minutes, down, against a 25-minute standard). At an ideal rate of 120 bottles per minute the filler counts 41,212 bottles, 40,580 good and 632 rejected. Planned production time is 450 minutes, run time 375 minutes, availability 83.3%, performance 91.6%, quality 98.5% and OEE 75.1%. For a food and beverage plant the useful part is the split. The break stays out of the losses, as a scheduled sanitation would. The cap shortage shows as idle, because the filler was ready and the material was not. The changeover is compared with its standard, so its 13 minutes over are the item for the next changeover review. Slow running cost 31.6 minutes and rejects 5.3 minutes, so rejects are not the first thing to chase on this shift. Try the same numbers in the OEE calculator.

What you provide and what you receive

You provide You receive
Line layout and machine list Signal inventory and connection plan for each machine
Sanitation and CIP schedule for each line Line OEE with sanitation as named planned time, tracked in minutes
SKU list with rated speeds and changeover standards Changeover report by type, against standard
Reject points and the reasons you use Reject counts by machine and reason, for every shift
Utility meters in place, and where new ones may be needed Energy and water per unit by line and shift
Time with operators and supervisors on each shift Onboarding at the line, quick guides, hosting and support

Starting with one line

A pilot connects one line, usually the one with the most changeovers or the one the plant manager asks about every morning. The written pilot plan names the machines, the signals, the sanitation rules and the acceptance measures: do the counts match the line counter, do the states match what operators saw, and does the report separate sanitation from downtime the way you agreed. See production monitoring for the boards and reports, and how a pilot line is set up.

Start with one line.

Tell us which line you want to understand and the question you ask after every shift. We reply with questions or a time to walk it with you.