A demand charge bills the highest average power your site drew in one short interval of the billing month, usually 15 minutes, at a price per kilowatt. One bad quarter hour, such as a Monday start-up in which compressors, heaters and battery chargers overlap, sets that charge for the whole month, and under some tariffs it raises charges for a year. To cut it, find the interval that set the bill in your utility’s interval data, see which loads were running in it from submeters and machine states, and stagger the loads that can wait.
This article explains how demand charges work, using one published US tariff as the worked example. It then walks through finding the peak interval, ranking the loads to stagger in plants, distribution centers and cold storage warehouses, and recording the evidence that a saving is real. All plant numbers are fictional and labeled; the tariff figures are one utility’s, quoted as an example, not as typical rates.
kW and kWh: what a demand charge bills
An electric bill measures two different things.
Energy, in kilowatt-hours (kWh), is how much electricity you used over the month. Demand, in kilowatts (kW), is how fast you were using it at the busiest moment, averaged over a short interval. The demand charge prices the second.
A guide that Oak Ridge National Laboratory wrote for the Department of Energy’s Better Plants program sets out the distinction (ORNL, Demand Response in Industrial Facilities: Peak Electric Demand, ORNL/SPR-2021/2299). Utilities charge all customers for the energy they use; industrial and some commercial customers are also charged for demand, which the guide defines as “the rate at which electricity is consumed”. Utilities “typically measure demand as the average electricity consumed over a 15-minute period”, and demand charges are usually based on the month’s peak. In the guide’s words, “depending on the rate structure, demand charges can be anywhere from 30% to 70% of a monthly electric bill.”
The guide also explains why the charge exists. It helps utilities recover the cost of building and maintaining the capacity needed to meet peak demand, and it falls on the customers who use the most; “almost all medium and large commercial customers pay demand charges.”
How a 15-minute average works
The demand for an interval is the energy used in that interval divided by its length. If a plant uses 100 kWh between 06:45 and 07:00, its demand for that interval is 100 kWh ÷ 0.25 h = 400 kW. The billed demand is the highest such interval in the billing period.
Two consequences follow from the arithmetic:
- Brief spikes barely register. For example, suppose a large motor start draws an extra 300 kW for 10 seconds. Spread over a 900-second interval, that adds 300 × 10 ÷ 900 = 3.3 kW to the average. A motor’s starting current is rarely what sets a demand charge.
- Sustained overlap does. For example, five loads of 40 kW each that run together for a full quarter hour add 200 kW to that interval. Peaks are made by the coincidence of loads that each look reasonable on their own.
The ORNL guide’s sample facility shows the gap between peak and average. On the day it charts, the load peaks at 340 kW, with a baseload of about 130 kW and an average load of 210 kW. The facility is billed for the 340.
Why industrial energy looks cheap per kWh
The U.S. Energy Information Administration puts the 2025 average retail price at 8.62¢ per kWh for industrial customers, against 13.41¢ for commercial and 17.30¢ for residential (EIA: Electricity explained, prices and factors affecting prices). EIA explains that industrial consumers “use more electricity and can receive it at higher voltages, so supplying electricity to these customers is more efficient and less expensive.”
A low price on the energy line can sit next to a large demand line. A blended price, the bill total divided by the kWh billed, hides which part of the bill a change would reduce. Before you value any saving, split it: does it reduce kWh, peak kW or both?
How one published tariff turns a peak into dollars
On a tariff with a demand charge, each kW added to the month’s highest interval costs as much as hundreds of kWh of energy. Rocky Mountain Power’s Wyoming Schedule 28 is a clear example of one such tariff, chosen because its text is short and public, not because it is typical.
Schedule 28, General Service, applies to non-residential customers whose demand has registered more than 20.50 kW, or whose energy use has registered more than 5,000 kWh, in more than six months of any continuous twelve (Rocky Mountain Power, Wyoming Schedule 28). The sheets posted when we checked in November 2026 set these prices for secondary delivery voltage (less than 11 kV):
- Basic charge: $58.75 a month for three-phase service.
- Demand charge: $17.83 per kW, for all kW.
- Energy charge: 2.541¢ per kWh, for all kWh.
- Reactive power charge: $0.60 per kVar, applied to the month’s maximum 15-minute reactive demand in excess of 40% of the measured kW demand.
The schedule defines demand as the kW “for the 15-minute period of Customer’s greatest use during the month, rounded to the nearest whole kW.” Monthly bills are also adjusted under five other schedules (92, 93, 95, 191 and 198), which the example below leaves out.
On this schedule, one kW added to the month’s peak costs $17.83, as much as 702 kWh of energy at 2.541¢. For example, a 50 kW load that runs for one quarter hour at the wrong moment uses 12.5 kWh, about 32 cents of energy, and adds $891.50 to that month’s demand charge.
| Line item | Billing quantity | Schedule 28 price, secondary voltage | Amount |
|---|---|---|---|
| Basic charge, three phase | 1 month | $58.75 | $58.75 |
| Demand charge | 400 kW | $17.83 per kW | $7,132.00 |
| Energy charge | 160,000 kWh | 2.541¢ per kWh | $4,065.60 |
| Reactive power charge | No kVar above 40% of 400 kW | $0.60 per kVar | $0.00 |
| Total before adjustments and taxes | $11,256.35 | ||
| Demand charge as a share of that total | 63.4% |
In this fictional month the demand charge is 63.4% of the bill before adjustments, inside the 30% to 70% range the ORNL guide describes. The plant’s average demand was 160,000 kWh ÷ 720 hours = 222 kW, so its peak was 1.8 times its average. A plant using the same kWh with a flatter profile would pay less for the same energy.
If the same plant brought its peak down by 48 kW, to 352 kW (the case worked through later in this article), the demand line would fall by 48 × $17.83 = $855.84 that month, with no change at all to the energy line.
Reactive demand, measured in kVar, is billed separately on this schedule, and only above 40% of the measured kW. Lowering it is a power factor project, a different job from peak shaving, so keep the two apart when you estimate savings.
Tariff clauses that change the plan
Before you plan a cut, read how your own tariff defines billing demand. Time-of-use windows, minimum billing demands and charges that remember the highest months of the past year all change which peaks matter and what a cut is worth.
Rocky Mountain Power’s Wyoming Schedule 46, Large General Service Time of Use for loads of 1,000 kW and over, shows several of these clauses in one document (Rocky Mountain Power, Wyoming Schedule 46):
- A time-of-use demand window. The on-peak demand charge, $19.02 per kW at secondary voltage, applies to the highest 15-minute demand in the on-peak hours, which the schedule sets as 7 a.m. to 9 a.m. and 4 p.m. to 11 p.m., all days. A peak at 10 a.m. does not count toward it.
- A floor. On-peak billing demand is the greater of the measured on-peak kW and 500 kW. Below the floor, a cut saves nothing on that line.
- A charge with a 12-month memory. The facilities charge, $4.21 per kW for customers up to 3,000 kW, is billed on the greater of 1,000 kW and the average of the customer’s two greatest monthly demands in the 12-month period that ends with the current billing month. One high month raises that charge for a year.
- A charge on all demand. The load size charge, $1.80 per kW up to 3,000 kW, applies to the month’s measured demand at any hour, again with a 1,000 kW floor.
Example (fictional). A fictional plant on Schedule 46 at secondary voltage peaks at 1,440 kW in every month except July, when its normal peak would be 1,450 kW, in the morning on-peak window. One July morning at 07:15, a restart after a power interruption brings every load back at once, and that 15-minute interval measures 1,800 kW. At the schedule’s prices, July’s on-peak demand charge rises by 350 kW × $19.02 = $6,657.00, and July’s load size charge by 350 kW × $1.80 = $630.00. The facilities charge base moves from the average of 1,450 and 1,440 kW (1,445 kW) to the average of 1,800 and 1,440 kW (1,620 kW). That adds 175 kW × $4.21 = $736.75 to each of the 12 bills whose window includes July, $8,841.00 in all. One quarter hour adds $16,128.00 over a year. The energy used in it, 350 kW × 0.25 h = 87.5 kWh at the schedule’s 0.975¢, cost about 85 cents.
Some tariffs and markets bill for your demand at the moment the grid peaks rather than at your own peak.
The ORNL guide describes coincident peak demand as your contribution to the system peak, typically measured over an hour. In the PJM market it is set from the previous year’s five highest summer peaks, and in the Texas (ERCOT) market from four coincident peaks over June to September. Customers can subscribe to alerts that warn when such a peak may occur.
| Clause | What to look for in the tariff text | What it changes in your plan |
|---|---|---|
| Demand interval | “15-minute period” or another interval length | How long loads must overlap to count |
| Time-of-use window | On-peak hours, days and seasons | Which peaks are billed at the higher rate, and which do not count |
| Floor | “The greater of” a measured value and a fixed kW | Cuts below the floor save nothing on that charge |
| Look-back | “Two greatest” demands in a 12-month period | One bad month costs money for a year |
| Coincident peak | Your share of the system or market peak | Your peak matters only when the grid’s does |
| Reactive power | kVar billed above a share of kW | A separate charge, cut by power factor work rather than staggering |
| Rounding and clock | “Rounded to the nearest whole kW”; interval start or end | How to match your own data to the bill |
When the wording is unclear, ask the utility’s account representative to explain in writing how billing demand is computed for your account.
Get the data: interval records, submeters and machine states
To find a peak you need three layers of data on one clock: the utility’s interval record for the whole site, submeter readings for the largest loads, and the states of the machines that drive them. The first layer tells you when the peak happened; the other two tell you which loads made it.
The utility’s interval data
Many utilities let customers download their own usage data. The Department of Energy describes Green Button as “an industry-led effort that responds to a White House call-to-action”, officially launched in January 2012, under which data “can be provided in 15-minute, hourly, daily, or monthly intervals depending on what a utility decides to make available” (DOE: Green Button). DOE says many utilities offer a “Download My Data” option and describes “Connect My Data” as a newer way to send data automatically to authorized third parties.
Ask for at least 12 months of 15-minute data, so you see every season and every look-back window.
Then check that the data reproduces the bill. For each billing period, using the bill’s read dates rather than calendar months, the highest interval should match the billed demand after rounding. If it does not, check the time zone, daylight saving time, whether timestamps mark the start or the end of each interval, and whether a floor applies.
Your own meter on the main service
Utility data describes the past. To see a peak while it is forming, you need your own power meter on the main service, read every few seconds to a minute. Compute the running 15-minute demand from the meter’s energy register rather than from instantaneous kW samples: the difference between two energy readings is exact, while an average of samples can miss short swings.
If a meter has a Modbus interface, a gateway can read its energy and power registers; how those readings become usable plant data is covered in Modbus to MQTT gateways. New meters and current transformers are installed by your electricians or a licensed contractor.
Submeters on the largest loads
You do not need a meter on everything. Start with loads that are large, that switch on and off, and that someone could move: air compressors, chillers and refrigeration compressors, ovens, furnaces and heater banks, battery chargers, and large motors on batch work such as grinders and granulators. A single-line diagram or panel schedule shows which feeders carry them, and the energy monitoring service page describes how a metering plan is written from bills and that diagram.
Machine states and production counts
A submeter says a compressor drew 110 kW. The machine state says why: both compressors loaded to refill the system after a weekend, or one compressor feeding leaks overnight. Running, idle and down states and counts from production monitoring show whether a peak happened during start-up, a changeover or full production, and they let you divide energy by output later.
One clock for everything
Put all three layers on one clock. Synchronize gateways to network time, store timestamps with their time zone offset, and record whether each source labels an interval by its start or its end.
If the gateway buffers readings while the internet link is down and sends them when it returns, the record stays complete; store and forward at the edge explains how. A gap in the data at the peak interval is the one gap you cannot afford.
Find the interval that set the bill: a step-by-step method
The interval that set the bill is one row in a year of interval data. Find it, list the loads that were running in it, and decide whether it was a one-off or a pattern. A pattern is what scheduling can fix.
- Load 12 months of interval data. One row per interval, with the timestamp, the kWh and the kW (kWh × 4 for 15-minute intervals).
- Mark the billing periods. Use the bill’s read dates, not calendar months.
- Find each period’s highest interval and check it against the bill. Resolve any mismatch before going further.
- List the ten highest intervals in each period, with day and time. Peaks that recur at the same time, such as Monday at 06:45 or a shift change at 14:45, are scheduling problems. Peaks scattered across hot afternoons point at cooling and refrigeration.
- Measure how sharp the peak is. Count the intervals within 5% of the peak. A handful means a spike that moving one or two loads can shave. Dozens mean a plateau, and the target is the base load itself, through efficiency.
- Apply the tariff’s windows. On a time-of-use tariff, repeat the search inside the on-peak hours only, and check the floors.
- Build a “who was running” table for the top intervals. Use submeters and machine states, with each load’s kW averaged over the same interval.
- Classify each load. Fixed (it must run then), movable (it can start earlier or later), sheddable (it can pause for a few minutes) or removable (it should not have been running at all).
- Set the target from the next peak down. The realistic new peak is the highest interval left after the movable loads move. Going lower takes efficiency work.
Example (fictional). A fictional injection molder with six presses is billed at Schedule 28’s prices. Its July bill shows 400 kW of billed demand and 160,000 kWh. The interval data puts the peak at 06:45 to 07:00 on a Monday after a weekend shutdown, and three of the month’s five highest intervals are Monday start-ups. Submeters and machine states give this table:
| Load | kW, peak interval (Monday 06:45 to 07:00) | kW, typical production interval |
|---|---|---|
| Building base: lighting, offices, HVAC, controls | 70 | 75 |
| Process chiller | 50 | 55 |
| Air compressors, two of 55 kW | 110 | 70 |
| Barrel heaters, six presses warming from cold | 120 | 42 |
| Press hydraulic pumps | 0 | 72 |
| Resin dryers, two | 50 | 30 |
| Total | 400 | 344 |
Every load that makes the difference is a start-up load; the presses had not started cycling. The production plateau runs at about 340 to 346 kW, and the month’s highest production interval, on a hot afternoon, is 352 kW. Moving the start-up loads can bring the bill down to about 352 kW, not lower.
Which loads to move first
Rank loads by how many kW they put into the peak interval, how long they can wait and what moving them risks. The best candidates are large, flexible and controlled by someone in the building: start-up heaters, battery chargers, compressors refilling the system and batch processes. Loads that protect product or people stay where they are.
The ORNL guide orders the options as a hierarchy: eliminating load, lowering it through energy efficiency, moving it (load shifting and load shedding) and substituting it with on-site generation. Efficiency lowers demand at every hour. Shifting can raise energy use elsewhere; the guide notes that energy used in the off-peak period may increase, “but the peak demand cost savings will compensate for the additional energy cost during that period.”
| Load | How it adds to a peak | How to move it | Watch for |
|---|---|---|---|
| Air compressors | Several load at once to refill the system after a shutdown; leaks add load at every hour | Start one compressor first and let the others start on pressure; fix leaks | Pressure at the point of use during start-up |
| Heater banks: barrel heaters, ovens, furnaces | Full power while warming from cold, often all at once | Start in groups, earliest group first | Extra holding energy and time to temperature |
| Battery chargers | Charging starts at the end of a shift, while other loads are still on | Stagger or delay charge starts; keep them out of the tariff’s peak window | Every truck charged before it is needed |
| Chillers and refrigeration compressors | Hot afternoons, recovery after defrost or long door openings | Pre-cool before the window; staging stays with the refrigeration contractor | Product temperature limits |
| Electric defrost heaters | Several evaporators defrosting at once | Spread defrost start times | Changes made by the contractor, within the controller’s limits |
| Large motors on batch work: grinders, granulators, mixers | Batches started whenever someone has time | Run batches outside the window, or one at a time | Material flow to the next step |
| Tests and trials | A new furnace test or a full-load equipment test | Schedule tests outside the peak window with the energy lead | Who else needs the test date |
Compressed air deserves its own mention because leaks raise compressor load around the clock, including in the peak interval. The Department of Energy’s compressed air tip sheet on leaks, published in 2004, says leaks often waste “as much as 20%-30% of the compressor’s output” (DOE Compressed Air Tip Sheet #3). The compressed air leak calculator estimates leak flow and power from a no-demand load and unload test.
What assessors recommend most often
The Department of Energy’s Industrial Training and Assessment Centers (ITAC) are university-based teams that provide “no-cost technical assessments” to small and medium-sized US manufacturers, and their recommendations are published in a public database (ITAC database). As of November 2026 the database lists these demand-related recommendation types:
| Recommendation type (database code) | Recommendations | Average savings | Average payback | Implementation rate |
|---|---|---|---|---|
| Reschedule plant operations or reduce load to avoid peaks (2.3131) | 1,657 | $13,896 | 0.4 years | 40.1% |
| Recharge batteries during off-peak demand periods (2.3132) | 598 | $5,602 | 0.5 years | 52.0% |
| Use a demand controller or load shedder (2.3191) | 644 | $15,820 | 1.2 years | 40.6% |
| Optimize plant power factor (2.3212) | 2,809 | $13,990 | 2.1 years | 36.9% |
Read these as a map of what assessors commonly find, not as a forecast for your site: they are averages across plants of very different sizes and tariffs. The rescheduling codes show the shortest paybacks, which fits their nature, since moving a start time costs little.
The ITAC site lists its eligibility rules: a US manufacturer with yearly energy bills greater than $100,000 and less than $3,500,000, annual revenue under $250 million, within 150 miles of a center. It adds that some requirements may be waived and that each center makes the final selection.
Distribution centers and cold storage: chargers, compressors and defrost
In a distribution center the movable loads are mostly battery chargers, conveyor and sorter start-ups, and HVAC. In a cold storage warehouse they are refrigeration compressors, evaporator fans and electric defrost. The method is the same as in a plant, but the constraints differ: trucks must be charged for the next shift, and product must stay within its temperature limits.
Battery chargers
The ORNL guide’s first worked example fits many warehouses. A manufacturer recharges five 10 kW battery-operated forklifts at the end of the day, and its peak demand is recorded every month between 4:30 p.m. and 5:00 p.m., while they charge. Its time-of-use tariff charges $6 per kW on-peak (9:00 a.m. to 5:00 p.m.) and $3 per kW off-peak, so charging after 5:00 p.m. saves 50 kW times the $3 difference: $150 a month, or $1,800 a year.
Two details in that example are worth copying. The saving is the difference between the two rates, because the chargers still add 50 kW to the off-peak demand.
And “after 5 p.m.” is off-peak only on that tariff. On Rocky Mountain Power’s Schedule 46, 4 p.m. to 11 p.m. is on-peak, so the same move would put the chargers inside the window. Copy the method, not the hours.
For a larger fleet, the same logic applies to start times. If every charger starts when the shift ends, their draws overlap in the same intervals.
Spreading start times across the hours before the next shift spreads the load, provided every truck is charged when it is needed. The distribution centers page lists the charger and energy signals worth reading.
Conveyors, sorters and building loads
At the start of a shift, conveyors and sorters start together with lights and HVAC, sometimes while chargers are still finishing. Whether that matters depends on how large those loads are compared with your chargers and HVAC, and the “who was running” table answers it. If conveyor start-ups do show up in the top intervals, starting zones in sequence a few minutes apart is a change for your controls engineer to evaluate.
Refrigeration and defrost in cold storage
In a refrigerated warehouse, compressors work hardest on hot afternoons and after defrost cycles or long door openings, and electric defrost heaters, where defrost is electric, add their own load. The ORNL guide describes how one Better Plants partner, Agropur Dairy Cooperative, responds to demand response events: cooler and freezer temperature setbacks, reducing lighting loads, turning off battery-charging forklifts and turning off its wastewater treatment plant for as long as possible. That is a demand response program rather than a demand charge, but its list of loads is the list a cold storage site would examine first.
Defrost schedules, setpoints and compressor sequencing belong to the refrigeration controls and the contractor who maintains them. Monitoring reads them; it does not change them.
What monitoring adds is evidence: the start and end of each defrost per evaporator, compressor runtime and room temperatures on the same timeline as the site’s 15-minute demand. Any change has to stay within the temperature limits set by your own quality procedures. The cold storage page describes those signals in more detail.
Example (fictional). A fictional refrigerated warehouse finds that six of its ten highest July intervals fall between 14:00 and 15:00, when electric defrost on four freezer evaporators overlaps the compressors’ afternoon peak. Its refrigeration contractor moves two of the four defrost start times to the early morning, within the controller’s limits. In August none of the ten highest intervals coincides with a defrost, the monthly peak is 28 kW lower than July’s, and the room temperature records for every defrost stay inside the limits in the site’s procedures. The facility manager files the comparison with the outdoor temperatures for both months, so a cooler August cannot be mistaken for the saving.
Staggering a start-up: a worked example
Staggering means starting loads that would otherwise overlap at different times, so their full-power periods fall into different 15-minute intervals. The sequence comes straight from the “who was running” table: start early what can run early, split the big groups, and let the production plateau become the new ceiling.
Back to the fictional molder. Its start-up loads were all switched on together at about 06:35 for a 07:00 production start. The new sequence:
- Resin dryers start at 05:00, because dry resin is needed before the first shot anyway.
- Barrel heaters start in two groups: presses 1 to 3 at 05:30, presses 4 to 6 at 06:15.
- Compressor 1 starts at 05:45 and refills the system alone; compressor 2 starts only on pressure.
- Everything else stays as it was, and the presses start cycling at 07:00.
Example (fictional). With the staggered sequence, the molder’s highest start-up interval is 06:45 to 07:00 at 301 kW, and demand stays below the production plateau until the presses start. The month’s new peak is set by production: 352 kW on a hot afternoon. At Schedule 28’s demand price, 48 kW less billed demand is worth 48 × $17.83 = $855.84 a month. The early starts cost energy: presses 1 to 3 hold at temperature about 45 minutes longer (3 presses × 7 kW × 0.75 h, about 16 kWh), and the dryers run about 90 minutes longer at about 30 kW (45 kWh). That is about 61 kWh per cold start; at five cold starts a month, 305 kWh × 2.541¢ = $7.75. The plant writes the sequence into the first-shift start-up checklist, and the shift lead signs it off each Monday.
A few practical points decide whether a stagger survives its first month:
- Someone has to be there, or something has to do it. A 05:00 start needs a person on site or a timer. Changes to controller logic or start-up sequences are made by your controls engineer, not by whoever reads the meter.
- Check the side effects. Time to temperature, air pressure at the first machines to start, first-hour quality and staff arrival times can all shift with a new sequence.
- Watch for the peak moving. Moving loads can create a new peak somewhere else, often at the end of a shift. Re-run the top-ten list every month.
- Automate only what can pause safely. A demand controller, or load shedder, switches selected loads off when the running average approaches a target. The ORNL guide describes load shedding as real-time and short-notice, using controls such as HVAC setpoint changes or dimming lights. Give it only loads that can pause for a few minutes without harm.
Proving the saving: what monitoring has to record
A demand saving is proved on the bill and explained by the data. The billed kW must fall, and the interval and submeter records must show that it fell because the moved loads no longer overlap, not because of cooler weather or a slow month.
Record the same things before and after the change, for at least three billing periods:
- From the bill: billed demand, on-peak demand and any look-back base, for each period.
- From the interval data: the ten highest intervals in each period, with day, time and their “who was running” table.
- From the lines: production (good units and operating hours) for each period, plus outdoor temperature where cooling or refrigeration loads matter.
- From the moved loads: their actual start times, taken from machine states or submeters, so you can show the new schedule was followed.
- The energy cost of the change: the extra kWh from early starts or holding, at your tariff’s energy price.
- Data completeness: any gaps in the interval or submeter records, especially at peak intervals.
Compare like with like: the same months last year, or months with similar production and weather, and say which you used. Energy per unit is a useful companion measure. The energy per unit calculator divides energy by good units, and its page notes that a blended price includes demand charges, so ask whether a saving reduces kWh, peak demand or both.
A running 15-minute average compared with a target turns the record into an early warning. An alert such as “projected demand for this interval is 390 kW against a 360 kW target; compressor 2 and both chargers are running” gives a shift lead a few minutes to act before the interval closes. That alert is only as good as the clock, the meter and the load list behind it, which is why the data work comes first.
What to do this month: a checklist
Demand charges reward knowing exactly which quarter hour set the bill and which loads were in it. This list takes you from the tariff to a first measured change:
- Find your tariff schedule and read how it defines demand, billing demand, on-peak hours, floors and any 12-month look-back.
- Download or request 12 months of 15-minute interval data, and check that it reproduces the billed kW for each period.
- List the ten highest intervals in each billing period with day and time, and mark the recurring patterns.
- Build a “who was running” table for the top intervals from submeters and machine states; add meters to the largest unmetered loads.
- Classify loads as fixed, movable, sheddable or removable, and pick one start-up or end-of-shift sequence to stagger first.
- Price the change with your tariff’s demand rate, and price the extra energy with its energy rate.
- Agree who owns each change: the shift lead for start-up sequences, the controls engineer for controller logic, the refrigeration contractor for defrost and setpoints, an electrician for new meters.
- Record before and after for at least three billing periods, normalized for production and weather.
- If you are a small or medium manufacturer, check whether you qualify for a no-cost ITAC assessment.
OpenGXT builds, hosts and maintains cloud software for manufacturers and distribution centers. Its energy monitoring puts submeter readings, 15-minute demand and machine states on one timeline, read-only, so the peak interval and the loads in it can be seen together. Every engagement starts with an equipment and data survey, described in how we work, and you can plan a pilot line with energy in scope from the start.