Manual downtime logs or machine signals: what each one misses

The reader questionShould a small plant track downtime by hand, from machine signals, or both, and what does each method miss?

A tiny worker writing in a paper logbook next to a small mechanical drum chart recorder that draws a wavy ink line on its own.

Use both, and give each one the job it does well. Let the machine record when every stop starts and how long it lasts, and ask the operator only for the reason, and only for stops longer than a threshold you set. A paper or spreadsheet log captures reasons but drops short stops and rounds the long ones; machine signals catch every stop to the second but cannot tell a jammed infeed from a wait for caps. Before you buy downtime tracking software, run both methods on one machine for two weeks and measure the gap.

This article compares the three common ways of doing machine downtime tracking in a small or mid-sized plant: a paper sheet or spreadsheet log, operator entry on a tablet at the line, and automatic capture of machine state from the controller or from an added sensor. It shows what each method records and misses, field by field, where short stops end up, how a hybrid is set up, and how to run the two-week comparison yourself. The definitions behind the numbers (which stops count as planned, how the reason list is built, which ideal rate to use) have their own articles, linked where they come up.

What a downtime record needs to hold

A usable downtime record answers five questions: when the stop started, how long it lasted, what state the machine was in, why it stopped and who responded. No single method answers all five well, so compare methods field by field rather than as a whole.

Field The question it answers Who or what knows it best
Start time When did the machine stop? The machine: a state change with a timestamp
Duration How many minutes were lost? The machine: the time until it runs again
State Was it down (fault, changeover) or idle (ready, but starved or blocked)? The machine, if it has signals for upstream and downstream conditions; otherwise the operator
Reason Why did it stop? The operator, helped by the active fault code
Response Who came, and how long did it take? The operator or technician, or a call button tied to a work request

Two more numbers sit beside the record. The first is the number of stops, not just their minutes.

Ten 3-minute stops and one 30-minute stop cost the same time but need different fixes, and the count is what mean time between failures is built from (the MTBF and MTTR calculator shows that arithmetic). The second is the production count for the same period, which reveals slow running that never shows up as a stop.

Two definitions have to be settled before any method produces numbers you can compare. One is which stops are planned.

Breaks, meetings, sanitation and scheduled maintenance are usually taken out of planned production time, and the choices are covered in planned stops in OEE. The other is the threshold: the stop length above which a stop counts as downtime and gets a reason, and below which it counts as slow running. Both decisions belong in writing, next to the OEE formula, so that next month’s numbers mean the same thing as this month’s.

Paper and spreadsheet logs: reasons without reliable minutes

A paper sheet or spreadsheet log is cheap, needs no IT and records the reason in the operator’s own words. It also loses most short stops, rounds the long ones and depends on someone remembering each stop after the fact, so its minutes understate and blur the real loss.

What the log gets right

The paper log’s strength is context. An operator can write “waiting on caps from the warehouse” or “coil end, new coil had a burr”, which no controller will ever report. It costs nothing to start, it works on an old hand press as well as on a new filler, and it keeps the people who run the machine involved in explaining it.

A spreadsheet adds arithmetic. Once the sheets are typed in, a supervisor can total minutes by reason, sort a Pareto chart and compare weeks.

Data validation, a drop-down list in each reason cell, cuts down on spelling variants. A downtime tracking spreadsheet built this way can be enough for a plant with a few long stops a shift to find the first problems worth fixing.

Where the minutes go missing

The weaknesses are all in the capture, not in the arithmetic:

  • Short stops are never written down. An operator clears a jammed part in 20 seconds and restarts. Writing it down would take longer than the stop, so nobody does, and dozens of them a shift disappear.
  • Durations are rounded. Hand-written durations cluster on multiples of 5 and 10 minutes. A 13-minute stop becomes 15; a 26-minute wait becomes 25.
  • Start times are recalled. Many sheets are filled in at a break or at the end of the shift, from memory. Two stops close together get merged, and a stop near a break lands on the wrong side of it.
  • Names drift. The same jam appears as “infeed jam”, “bottle jam” and “feed problem”, which splits one cause across three rows of the Pareto chart.
  • Entry lags. Sheets typed in days later cannot be questioned. By then nobody remembers whether “maint” meant a breakdown or a planned adjustment.
  • Some stops are left out. A stop that makes a shift look bad is the easiest one to forget, and a log has no way to show what is missing from it.

Typing the sheet into a spreadsheet fixes none of these. It produces tidier totals from the same incomplete record.

Example (fictional). On a fictional beverage bottler’s Line 2 filler, first shift (06:00 to 14:00), the machine timeline shows three unplanned stops: a bottle feed jam at 07:41 lasting 11 minutes, a 26-minute wait for caps from the warehouse at 10:41, and a 38-minute changeover to 1-liter bottles at 12:18, against a 25-minute standard. Suppose the paper sheet for the same shift reads “feed jam, about 10 min”, “waiting caps, 25 min” and “changeover to 1 L, 40 min”. The paper total is 75 minutes, the same as the timeline by coincidence, but every line is off, and the changeover looks 15 minutes over its standard instead of 13. The bigger gap is what the sheet cannot show at all. The shift lost 31.6 minutes to slow running, which on this line includes every stop shorter than its 2-minute threshold. Performance was 91.6%, and the paper log has nothing to say about where the rest went.

Operator tablet entry: better clocks, the same blind spots

A tablet or terminal at the line timestamps a stop when the operator taps it, forces a choice from the reason list and makes the data visible during the same shift. It still depends on a person tapping at the right moment, so short stops, and stops during busy periods, are missed or entered late.

A typical setup has a “stopped” button, a reason list in two levels, and “maintenance called” and “maintenance arrived” buttons that time the response. Compared with paper, this removes the transcription step and enforces consistent names. It is also the cheapest way to capture the response field, which no machine signal holds.

Its failure modes are predictable:

  • Late taps. The operator’s first job during a stop is to fix it. Many stops are entered after the restart, with the start time guessed.
  • Stops left open. A stop opened on the tablet and never closed keeps running until someone notices, sometimes past a break or a shift change.
  • The first item on the list. Under time pressure people pick the top reason, or “Other”. A long list makes this worse; a short one written in the operators’ words makes it better, as covered in downtime reason codes.
  • Short stops again. Nobody taps twice for a 20-second jam.

So a tablet improves the reason and response fields and somewhat improves start times. Its durations still depend on discipline, and its short-stop data is close to empty. It is a good front end for reasons and a weak clock.

The Aston University study described in the next chapter shows the same pairing from the buyer’s side. Among the commercial options its authors priced, one kit combined a current sensor on each machine with a tablet on which operators enter stop reasons and quality inspections. The sensor keeps time; the tablet collects reasons.

Machine signals: exact minutes, no reasons

Automated downtime tracking records every change of machine state with a timestamp, so start times, durations and short stops are complete. What it cannot record is anything that happens outside the machine’s own logic: the caps that did not arrive, the operator pulled to another line, the quality hold.

Signals from the controller

Most machines built in recent decades have a PLC or machine controller that already knows whether the machine is running. The signals worth reading for downtime are a running state or run bit, the active fault code or fault word, a cycle or good-part count and a reject count.

A gateway reads them read-only, timestamps every change and passes them to the software that builds the stop list. How those connections are made, and why read-only access is the default, is covered under machine connectivity.

Some machines publish a standard state model. PackML was developed by OMAC and adopted by ISA as TR88.00.02, and OMAC describes it as “the automation standard that makes it easier to transfer and retrieve consistent machine data” (OMAC: PackML). Packaging equipment that follows it saves much of the work of mapping raw bits to states.

OPC UA for Machinery, Part 1: Basic Building Blocks (OPC 40001-1, release 1.04.2, published November 1, 2026) defines a machine state with four values (OPC 40001-1 online reference):

  • Executing: available and actively performing an activity, such as producing.
  • OutOfService: available but unable to perform any activity, for “a technical reason originating from within” the machine, such as an error or a needed maintenance action.
  • NotExecuting: available and functional but not performing any activity, for “an organizational reason originating from outside” the machine, such as waiting for a new order or for loading.
  • NotAvailable: not available at all, for example switched off or in energy-saving mode.

The same specification defines optional operation counters for how long a machine has been powered on and how long it has been performing an activity.

The split between OutOfService and NotExecuting is the down-versus-idle split every downtime report needs, written into a standard.

Notice what is missing from it: the specific reason. A machine can report that it is waiting. It cannot report that it is waiting for caps.

Signals from an added sensor

Older machines often have no readable controller: relay logic, a locked PLC with no spare communication port, or a hand-operated press. These can still produce a timestamped signal from an added sensor, fitted by the plant’s electricians: a proximity sensor that counts parts or strokes, a current sensor on a motor feed, or a contact on an existing run lamp. The options for machines like these are compared in connecting older machines without OPC UA.

A 2024 study from Aston University shows how small this can start (Kamble, Clegg, Masi and Al-Bazi, Aston University repository). The authors fitted a hand press used for forming pins at a small manufacturer, as part of a UK Knowledge Transfer Partnership, with an inductive proximity sensor, mounted beneath the hole where each pin is inserted, and wired it to a low-cost ESP8266 microcontroller. Each detection was stored with a timestamp in an SQL database, and a dashboard showed hourly production and downtime.

The study’s downtime rule is a useful starting point. A gap of more than 2 minutes between two successive counts, outside the scheduled breaks, was recorded as downtime.

The authors chose 2 minutes to cover the cycle time “plus a few seconds of tolerance for the operators”, and noted that in-process gauge checks at the machine take less than 2 minutes, so they fall under the threshold. Where an operator has to walk to the quality department for an inspection, the authors proposed a push button on the kit, so that time is booked as inspection rather than downtime.

The study’s costs are a reality check too. The hardware came to about £93. The research, development and staff time came to £10,400.

The authors also list the limits of their build: concern about how long the microcontroller board will last, the lack of documentation for long-term maintenance, and a database that would need redesigning to scale to more sensors. Cheap hardware is the easy part. Definitions, upkeep and documentation are where the effort goes.

What signals cannot tell you

Even a complete set of signals leaves gaps that only people can fill:

  • External causes. Material shortages, a missing operator, a quality hold, a meeting, a forklift that did not come. The machine sees “not running” and nothing more.
  • The cause behind a fault code. A “bottle feed jam” fault may be caused by out-of-spec bottles from a supplier. The code names the symptom at the machine.
  • Whether a stop was planned. Unless the schedule is loaded, a break and a breakdown look the same.
  • Who responded, and when. No state change marks a technician’s arrival.
  • Cascades. When one machine stops a line, its neighbors go idle. Without signals for starved and blocked conditions, every machine on the line looks down at once.

Side by side: what each method records and misses

No single method fills every field of a downtime record. Signal-based methods are strong on time and weak on reasons, the human methods are the reverse, and a hybrid takes each field from the source that knows it.

FieldPaper or spreadsheet logOperator tabletController signalsAdded sensorHybrid
Start timeRecalled, often roundedWhen tapped, often lateExact, to the secondExact, from count gaps or currentExact, from the signal
DurationRounded to 5 or 10 minDepends on closing the stopExactExact, within the gap ruleExact, from the signal
Stops under the thresholdMostly missingMostly missingAll, counted and timedAll, if the sensor reads countsAll, counted and timed
ReasonYes, free textYes, from a listFault code onlyNoneFrom the operator, fault code pre-filled
Idle versus downIf the operator writes itIf the list separates themWhere starved and blocked signals existNoFrom signals or the operator
Who respondedSometimesYes, with call and arrival tapsNoNoYes, with call and arrival taps
Planned versus unplannedBy the operatorBy the operatorOnly with the schedule loadedOnly with the schedule loadedFrom the schedule
Effort to startNoneA device and a reason listController access and a gatewayA sensor fitted by an electricianSignals, a reason list and a threshold
What each method captures for the five fields of a downtime record, plus three practical rows. Basis: the method comparison in this article. A qualitative summary, not measured data.

Three things stand out when you read across the rows.

Only the signal-based columns see short stops, so any method without a signal leaves the performance loss unexplained. Only people supply external reasons and response times, so any method without an operator leaves the biggest stops unexplained. And the added sensor is only as good as the signal it reads: a count catches a machine that runs without producing, while a current sensor or a run lamp does not.

The bottom row is easy to underestimate. Whichever column you choose, someone has to decide the threshold, map raw signals to states, write the reason list and keep them current. That work is the same whether you buy downtime tracking software, build your own or stay on paper with better definitions.

Short stops: the losses only signals can see

Short stops, often called micro stops, last from a few seconds to a minute or two. They rarely reach any log written by hand, yet they are a named OEE loss. If you do not measure them, they show up only as a performance rate nobody can explain.

The Lean Enterprise Institute defines OEE as availability rate × performance rate × quality rate (LEI lexicon: overall equipment effectiveness). It places “stoppages lasting a few seconds” in the performance rate, together with running below design speed, and names minor stoppages among the six major losses OEE typically focuses on: failures, adjustments, minor stoppages, reduced operating speeds, scrap and rework.

That puts the threshold at the center of the method choice.

Every stop longer than the threshold is downtime: it lowers availability and gets a reason. Every stop shorter than it is slow running: it lowers performance and is counted rather than explained. A paper log sets the threshold, in effect, at whatever the operator bothered to write down, which changes from person to person and shift to shift.

Choosing the threshold

Start from the cycle, as the Aston authors did. The threshold should be longer than a normal cycle plus the small pauses that belong to the work, such as loading a part or a quick gauge check. Then look at what it costs in prompts.

From two weeks of signal data you can count how many stops a threshold of 1, 2 or 5 minutes would have turned into reason prompts per shift. Ask the operators how many they can answer without leaving the work, and pick the threshold that matches. Write it into the data dictionary and keep it fixed long enough to compare months.

Measuring short stops properly

Short stops should be counted and timed, not ignored. Report them as a count and as total minutes per shift, broken down by hour and by product. Patterns usually say more than totals: a cluster of 30-second stops in the first hour after each changeover points at settings, while a steady drizzle across the shift points at material or a worn part.

Two configuration details matter more than they look:

  1. A merge rule. A machine that restarts for 4 seconds and stops again has not had two separate stops. Decide how long a run must last before a new stop is counted, and write it down.
  2. Count versus state. A motor can turn while no parts are made, for example when a machine dry-cycles or a conveyor runs empty. A running state or a current sensor calls that running; a part count does not. Where you can, read both.

How much time slow running costs also depends on the ideal rate the performance figure is measured against. That is a separate decision, covered in ideal cycle time for OEE.

The hybrid: the machine records when, the operator records why

In a hybrid, the machine creates every stop record automatically and the operator adds a reason only to stops above the threshold, at the line, while the stop is fresh. Each field comes from the source that knows it, and the operator answers a handful of prompts per shift instead of keeping a log.

Running Down, reason asked Short stop, under 2 min Machine signal Shift board Paper sheet Down 07:41 to 07:52, 11 min 6 short stops: timed, no prompt Asked at restart, 07:52: Bottle feed jam, fault code pre-filled Written at the 10:00 break: "Feed jam, about 10 min" No short stops recorded 07:30 07:45 08:00 08:15 08:30
Fictional example: one hour of the Line 2 filler's first shift. The 11-minute bottle feed jam is from the shared Line 2 example; the six short stops are illustrative. Basis: the hybrid design described in this chapter.

The design choices that make a hybrid work are mostly decisions, not features:

  1. The machine opens and closes every record. The gateway or controller timestamps each state change. Nobody types a time.
  2. Only stops above the threshold ask for a reason. Shorter stops are counted and timed, without a prompt.
  3. Ask at restart, not at the stop. During the stop the operator is busy fixing it. A prompt that appears when the machine runs again, and stays on screen until it is answered, gets better answers.
  4. Pre-fill from the fault code where it is reliable. If the active fault code says infeed jam, offer that reason first and let the operator confirm or change it.
  5. Keep the reason list short and in the operators’ words. Two levels and a short list, built with the supervisors. Building and maintaining that list is the subject of downtime reason codes.
  6. Separate idle from down. “Ready but starved or blocked” belongs to planning, the warehouse or the neighboring machine, not to maintenance.
  7. Planned stops come from the schedule. Breaks and sanitation are loaded in advance, not entered as reasons.
  8. Corrections are allowed and logged. A supervisor can relabel a stop, and the change is stored with who made it and when.
  9. Unanswered minutes are reported as unanswered. Stops still without a reason at the end of the shift appear as their own line, not folded into “Other”, so the gap stays visible.

All of this goes into the data dictionary: the state map, the threshold, the merge rule, the reason list and the correction rule. That document is what lets a second-shift supervisor and a CI lead three months later read the same number the same way. The production monitoring service page describes a shift board and shift report set up this way, and the fictional example project follows one bottling line from its signal list to its first shift report.

Run a two-week comparison on one machine before you buy

Pick one machine, keep the current log exactly as it is, add a timestamped signal for the same machine, and reconcile the two every day for two weeks. The gap you measure tells you whether automatic capture is worth paying for, which threshold to set and how many prompts a hybrid would ask.

The procedure

  1. Pick the machine. Choose one with frequent stops, your bottleneck if you know it, and a supervisor who wants the answer. Avoid the most complicated line in the plant for a first test.
  2. Pick the signal. Read a running state and a part count from the controller if your controls engineer agrees to read-only access. If not, have your electrician fit a count sensor or a current sensor. A count is better than a run signal, because it also catches dry cycling.
  3. Fix the clock. Synchronize the gateway or logger to network time and note the time zone. Note which clock the operators use for the paper log: a wall clock, a phone or the HMI.
  4. Tell people what is happening. Explain that the sensor records machine states and counts, and that the test compares two methods, not two people. Do not ask anyone to log more carefully than usual, or you will be measuring a different log.
  5. Load the planned stops. Enter breaks and other planned stops for each shift, so the signal data can set them aside.
  6. Reconcile daily. Match each paper entry to a signal stop that overlaps it in time. Put every stop in one of three bins: matched, paper only or signal only. For matched stops, record both durations.
  7. Compute the measures after ten shifts. Use the table below.
  8. Decide. Use the decision rules in the next chapter.

The reconciliation needs nothing more than a spreadsheet with one row per stop and a column for each source. Record which signal you used, its address, units and sample rate in a signal inventory worksheet, so the test can be repeated on the next machine.

Measure How to compute it What it tells you
Match rate Matched stops ÷ signal stops above the threshold How much of the real downtime the log sees
Missing minutes Minutes of signal-only stops above the threshold Downtime the log never recorded
Duration error Median absolute difference on matched stops How far you can trust logged durations
Short-stop load Count and minutes of stops below the threshold, per shift Performance loss the log cannot explain
Paper-only entries Logged stops with no matching signal stop Clock errors, planned time logged as downtime, or a signal that misses something
Reason coverage Share of signal minutes above the threshold that have a logged reason How much downtime has an explanation
Prompt load Signal stops above the threshold, per shift How often a hybrid would ask for a reason

Example (fictional). A fictional metal stamping shop runs Press 4 on one shift, 07:00 to 15:30, with 50 minutes of planned breaks, so each shift has 460 minutes of planned production time and the two-week test has 4,600. The paper log stays as it is. A proximity sensor on the ram counts strokes, and any gap longer than 2 minutes outside the breaks counts as a stop.

After ten shifts, the paper log holds 38 entries totaling 610 minutes. The signal shows 61 stops longer than 2 minutes, totaling 702 minutes, plus 412 shorter stops totaling 236 minutes. Of the paper entries, 34 match a signal stop: those stops total 571 minutes on paper and 584 minutes by the signal, and 31 of the 34 paper durations end in 0 or 5. Another 27 signal stops, 118 minutes in all, appear nowhere on paper; most are coil splices, parts cleared by hand and waits for a forklift to swap a full bin. Four paper entries, 39 minutes, match no signal stop. One fell inside the lunch break, one was a die adjustment during which the operator jogged the press so the sensor kept seeing strokes, and for two the signal shows the press running steadily at the written time.

The measures: a match rate of 34 ÷ 61 = 56%, 118 missing minutes, a short-stop load of about 41 stops and 24 minutes per shift (5.1% of planned production time), and a prompt load of about 6 per shift. Availability comes out at 86.7% from the paper log and 84.7% from the signal. The shop sets up a hybrid with a 2-minute threshold, adds a setup button so die adjustments stop counting as running, and opens a separate look at coil splices, the largest group of unlogged stops.

To put a price on the gap, enter the missing minutes in the downtime cost calculator with your own production rate and margin. Run it a second time with the short-stop minutes: lost running time costs output whichever OEE factor it lands in.

Choosing a machine downtime tracking method for your plant

The right method depends on how many stops a machine has per shift, how short they are, whether its controller can be read and how much its lost minutes cost. Treat the table below as a starting rule and let your two-week comparison overrule it.

Situation Start with Why
A few manual machines with long cycles and a handful of stops a shift A paper or tablet log with a short reason list Stops are long and visible; confirm with the two-week test that short stops are small
A high-speed filling, packaging or converting line A hybrid from the start Short stops are frequent, and only a signal sees them
A machine whose PLC can be read Controller signals through a gateway, read-only, plus reason prompts The states and fault codes already exist, and reading them changes nothing on the machine
An older machine with no readable controller An added count sensor, or a current sensor where a count is impractical, plus reason prompts A count catches dry cycling; fitting it is electrician work
Several shifts with different supervisors A hybrid with the threshold and reason list written down Paper logs drift from person to person; timestamps do not
One bottleneck in a plant of many machines Instrument the bottleneck first Minutes lost at the bottleneck are lost for the plant; elsewhere buffers may absorb them

A few cautions apply in every case. Do not instrument everything at once: the definition work (threshold, state map, reason list) has to be done for each machine type, and that is where projects stall.

Do not retire the paper log the day the signal goes live; run both until the hybrid’s reason coverage is at least as good as the paper’s. And make sure you can get the stop list out in an open format such as CSV, so the data outlives whichever software produced it, a point covered on our open data page.

Getting operators to trust the numbers and feed them

Monitoring that feels like surveillance produces poor reason data, and reasons are the part only operators can supply. Treat the hybrid as a tool for the machine’s problems, show it to the people at the line and act on what they report.

The Aston authors name the risk plainly: “Shop floor employees may perceive the technology as a threat, especially when manual hand machine outputs are monitored.” They addressed it with a structured change-management method, and they recommend that management explain the vision and objectives clearly and run training and engagement workshops for everyone involved, from the shop floor to administrative staff.

Practical steps that follow from that:

  • Say what is recorded. Machine states, counts and the reasons operators enter. Not people’s locations and not individual speed.
  • Put the board where the operators are. If the stop list is visible at the line, operators see the same data managers see, and they can correct it.
  • Use their words. Reasons written with operators and supervisors get picked. Reasons written by an engineer get “Other”.
  • Close the loop every week. Review the top three reasons with the crew and fix one. Nothing ends reason entry faster than answers that go nowhere.
  • Keep stop data about machines. Use it to fix equipment, material flow and changeovers. If it turns into a tool for disciplining individuals, the reasons stop being honest.
  • Write a quick guide for each board. One page on answering a prompt, correcting a stop and what the threshold means.

What to do next: a checklist

Machine downtime tracking pays off when the time comes from the machine and the reasons come from people, and when both follow written definitions. Before you choose software, work through this list:

  • Write down the five fields every downtime record must hold, and which source should own each one.
  • List your planned stops and choose a candidate threshold from your cycle time plus normal pauses.
  • Pick one machine for a two-week comparison and agree read-only signal access with your controls engineer, or plan an added sensor with your electrician.
  • Record the signal in a signal inventory, synchronize its clock and load the shift’s planned stops.
  • Reconcile the log and the signal daily, then compute the seven measures after ten shifts.
  • Price the missing minutes and the short-stop minutes with the downtime cost calculator.
  • If you choose a hybrid, build the reason list with operators and settle which stops are planned before go-live.
  • Decide which exports you need, and in which formats, before you sign for any software.

OpenGXT builds, hosts and maintains cloud software for manufacturers and distribution centers, including production monitoring that works this way: a gateway reads machine states and counts read-only, and the shift board asks for reasons above the threshold you set. Every engagement starts with an equipment and data survey, described in how we work. If you want to run this comparison on one line with that kind of setup, you can plan a pilot line.

Working on this at your plant?

If this article describes a problem on one of your lines, tell us about it. We start with one line, its signals and the question you ask after every shift.